Permit Case Summary

Case Number: Search Help

Case Number:SEP2003-00194 Case Status:Finaled Date Received:7/24/2003
Description:lot 11 info from expired case SEP00-84 filed with this case Date Issued:8/15/2003
Applicant:DARYL HEDMAN Expiration Date:8/15/2006 12:00:00 AM
Site Address:186 1ST ST Case Finaled:6/13/2005
Parcel No:962900011 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: OSS Inspection-1 Year
Date Completed: 3/5/2010
Disposition: DONE
Description: OSS Inspection-1 Year
Date Completed: 7/6/2007
Disposition: DONE
Description: OSS Inspection-6 Months
Date Completed: 7/26/2006
Disposition: DONE
Description: OSS Inspection-6 Months
Date Completed: 1/6/2006
Disposition: DONE
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 6/13/2005
Disposition: DONE
Description: Issue permit (F)
Date Completed: 8/15/2003
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 7/25/2003
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 7/25/2003
Disposition:
Description: Case Entered
Date Completed: 7/25/2003
Disposition:
Description: Stormwater Review-U
Date Completed: 8/15/2003
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/15/2003
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 8/7/2003
Disposition: DONE
Description: Pressure test required
Date Completed: 6/7/2005
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 AND JEFFERSON COUNTY CODE 8.15 ALL SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM. While the County strongly recommends that the property owner allow inspectors to enter their property to inspect the system in order to insure that the system is functioning correctly, the property owner always has the right under the Fourth Amendment and our State Constitution, to refuse the inspectors access to their property. The property owner never loses the right to refuse access and can do so despite never having refused access before.

Title: pressure test observation
Wording Health Dept. required to observe pressure test when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: installed on natural contours
Wording Drainlines are to be installed along the natural contours.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: MONITORING SCHEDULE
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED AT 6 MONTHS, AT ONE YEAR AND ANNUALLY THEREAFTER.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.