Permit Case Summary

Case Number: Search Help

Case Number:SEP2003-00182 Case Status:Finaled Date Received:7/14/2003
Description:system serves residence on 021-324-011. info from SEP98-152 filed with this case Date Issued:8/8/2003
Applicant:DENNIS BURK- SYSTEM OWNER Expiration Date:8/8/2006 12:00:00 AM
Site Address: GRIFFITH POINT RD Case Finaled:9/20/2005
Parcel No:021324032 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: 'Corrections Required' letter
Date Completed: 11/16/2010
Disposition: DONE
Description: OSS Inspection-6 Months
Date Completed: 11/15/2010
Disposition: DONE
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 9/20/2005
Disposition: DONE
Description: OSS Inspection-6 Months
Date Completed: 5/19/2004
Disposition: DONE
Description: Issue permit (F)
Date Completed: 8/8/2003
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 7/15/2003
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 7/15/2003
Disposition:
Description: Case Entered
Date Completed: 7/15/2003
Disposition:
Description: Stormwater Review-U
Date Completed: 8/8/2003
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/8/2003
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 7/30/2003
Disposition: DONE
Description: Pressure test required
Date Completed: 11/19/2003
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 AND JEFFERSON COUNTY CODE 8.15 ALL SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM. While the County strongly recommends that the property owner allow inspectors to enter their property to inspect the system in order to insure that the system is functioning correctly, the property owner always has the right under the Fourth Amendment and our State Constitution, to refuse the inspectors access to their property. The property owner never loses the right to refuse access and can do so despite never having refused access before.

Title: pressure test observation
Wording Health Dept. required to observe pressure test when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: well setback requirement
Wording Setbacks to all wells- 100' required from drainfield and reserve areas. 50' required from tanks and effluent transport lines.

Title: dry season installation
Wording Dry season installation required.

Title: reserve area, alternative
Wording When/if designated reserve area is utilized an alternative system providing an additional level of treatment may be required.

Title: easement
Wording Recorded easement required for primary and/or reserve drainfields. Easement recorded July 1998, #413141 with the Jefferson County Auditors office.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: installed on natural contours
Wording Drainlines are to be installed along the natural contours.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: minimum land area waiver
Wording This site has been granted a waiver from WAC 246-272 under Jefferson County Policy 97-2. The site requires a minimum land area of 1 ACRE where an individual well is used. 35,000 square feet are available on the site. The waiver was approved based on land area averaging where the drainfield is on a separate parcel and when averaged with the residence the land area is greater than 1 acre.

Title: MONITORING SCHEDULE
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED AT 6 MONTHS, AT ONE YEAR AND EVERY ANNUALLY THEREAFTER.

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.