Permit Case Summary

Case Number: Search Help

Case Number:SEP2002-00273 Case Status:Finaled Date Received:11/22/2002
Description: Date Issued:6/14/2003
Applicant: HARVEY J MINNIHAN CO Expiration Date:6/14/2006 12:00:00 AM
Site Address:210 PATISON ST Case Finaled:11/11/2004
Parcel No:998300051 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 11/11/2004
Disposition: DONE
Description: Issue permit (F)
Date Completed: 6/14/2003
Disposition: DONE
Description: Pending letter; add inf (F)
Date Completed: 6/14/2003
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 11/25/2002
Disposition: DONE
Description: Case Entered
Date Completed: 11/25/2002
Disposition:
Description: Stormwater Review-U
Date Completed: 12/4/2002
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 12/4/2002
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 12/3/2002
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 11/25/2002
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 11/25/2002
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: low use water fixures
Wording Low use water fixtures required, 1.6 gal. flush toilets and 2.5 gpm shower heads.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: installed on natural contours
Wording Drainlines are to be installed along the natural contours.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: risers
Wording Risers are required to grade with secured lids over the inlet and outlet of the septic tank. Minimum 24" riser over inlet.

Title: MONITORING SCHEDULE
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED EVERY 3 YEARS.

Title: conventional-asbuilt required
Wording An asbuilt drawing and certification of completion by the installer is required prior to final approval.

Title: riser on d-box
Wording Distribution boxes shall be fitted with a riser to grade, constructed of durable materials and a secured lid, adequately sized to allow visible inspection of the liquid level in the box.

Title: System Capacity-no ADU
Wording This system as designed and approved is sized for only one single family residence. It is not sized for an Accessory Dwelling Unit (ADU). The minimum daily design flow per residence is 240 GPD.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: Setback - Drains
Wording A 30' setback shall be maintained from the disposal component and reserve area to any downslope footing, curtain or interceptor drain or drainage ditch.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.