Case Number:SEP2002-00145 Case Status:Finaled Date Received:6/28/2002
Description:SEP94-500 AND SEP99-66 NOW FILED HERE Date Issued:7/11/2002
Applicant: BISHOP LOGGING COMPANY Expiration Date:7/11/2005 12:00:00 AM
Site Address:73 SYCAMORE ST Case Finaled:3/17/2003
Parcel No:932300025 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: OSS Inspection-1 Year
Date Completed: 3/22/2007
Disposition: DONE
Description: OSS Inspection-1 Year
Date Completed: 3/24/2006
Disposition: DONE
Description: OSS Inspection-1 Year
Date Completed: 3/10/2005
Disposition: DONE
Description: OSS Inspection-1 Year
Date Completed: 3/18/2004
Disposition: DONE
Description: OSS Inspection-6 Months
Date Completed: 9/24/2003
Disposition: DONE
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 3/17/2003
Disposition: DONE
Description: Issue permit (F)
Date Completed: 7/11/2002
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 7/1/2002
Disposition: DONE
Description: Case Entered
Date Completed: 7/1/2002
Disposition:
Description: Stormwater Review-U
Date Completed: 7/11/2002
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 7/11/2002
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 7/11/2002
Disposition: DONE
Description: Pressure test required
Date Completed: 3/5/2003
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 7/1/2002
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 7/1/2002
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.

Title: pressure test observation
Wording Health Dept. required to observe pressure test when system fully installed/complete, 48 hours notice to be provided for scheduling.

Title: alternative-asbuilt required
Wording An asbuilt drawing and certification of completion by the designer is required prior to final approval.

Title: low use water fixures
Wording Low use water fixtures required, 1.6 gal. flush toilets and 2.5 gpm shower heads.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: installed on natural contours
Wording Drainlines are to be installed along the natural contours.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: env. sensitive area conditions
Wording Compliance with the Environmentally Sensitive Areas Review conditions is required.

Title: risers
Wording Risers are required to grade with secured lids over the inlet and outlet of the septic tank. Minimum 24" riser over inlet.

Title: protective barriers
Wording Permanent barriers are required along/around primary and reserve drainfield areas to protect from parking, driving, and other land disturbing activities prior to final.

Title: Water line setback
Wording 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.

Title: CUSTOM CONDITION-HOLD
Wording Trench to be maximum 12-18 inches deep to enhance nitrogen uptake in accordance with requirements for nitrogen bmp's

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.