Case Number:SEP2001-00199 Case Status:Finaled Date Received:10/10/2001
Description: SEP80-190 is filed with this permit Date Issued:10/18/2001
Applicant:EFFRAN LOVATO TRUSTEE Expiration Date:10/18/2004 12:00:00 AM
Site Address:32 PINE CT Case Finaled:2/4/2002
Parcel No:998300045 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 2/4/2002
Disposition: DONE
Description: Issue permit (F)
Date Completed: 10/18/2001
Disposition: DONE
Description: Review Complete-U
Date Completed: 10/18/2001
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 10/11/2001
Disposition: DONE
Description: Case Entered
Date Completed: 10/11/2001
Disposition:
Description: Stormwater Review-U
Date Completed: 10/18/2001
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 10/18/2001
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 10/16/2001
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 10/11/2001
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 10/11/2001
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: other setbacks req.
Wording 10' min. water line setback required from any portion of septic system or reserve area

Title: low use water fixures
Wording Low use water fixtures required, 1.6 gal. flush toilets and 2.5 gpm shower heads.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: installed on natural contours
Wording Drainlines are to be installed along the natural contours.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: UDC compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.

Title: risers
Wording Risers are required to grade with secured lids over the inlet and outlet of the septic tank. Minimum 24" riser over inlet.

Title: conventional system monitoring
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED EVERY 3 YEARS.

Title: conventional-asbuilt required
Wording An asbuilt drawing and certification of completion by the installer is required prior to final approval.

Title: riser on d-box
Wording Distribution boxes shall be fitted with a riser to grade, constructed of durable materials and a secured lid, adequately sized to allow visible inspection of the liquid level in the box.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.