Case Number:SEP2001-00100 Case Status:Finaled Date Received:7/2/2001
Description: Date Issued:8/30/2001
Applicant:GERTRUDE ADAMS Expiration Date:8/30/2004 12:00:00 AM
Site Address:20 MONTGOMERY ST Case Finaled:1/24/2002
Parcel No:956701004 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 1/24/2002
Disposition: DONE
Description: Issue permit (F)
Date Completed: 8/30/2001
Disposition: DONE
Description: Pending letter; add inf (F)
Date Completed: 8/29/2001
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 8/9/2001
Disposition: DONE
Description: Case Entered
Date Completed: 7/3/2001
Disposition:
Description: Stormwater Review-U
Date Completed: 7/23/2001
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 7/23/2001
Disposition: DONE
Description: Consistency Review-U
Date Completed: 8/30/2001
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 7/3/2001
Disposition: DONE
Description: Initial Site Inspection by HD
Date Completed: 6/7/2001
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 7/3/2001
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: other setbacks req.
Wording Water line must be 10' minimum from septic system and reserve drainfield area, where in conflict, must meet DOE Sewage Works Design Manual.

Title: trench depth
Wording MAXIMUM TRENCH DEPTH 20 INCHES

Title: reserve area, alternative
Wording When/if designated reserve area is utilized an alternative system providing an additional level of treatment may be required.

Title: low use water fixures
Wording Low use water fixtures required, 1.6 gal. flush toilets and 2.5 gpm shower heads.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: transport line double cased
Wording Any portion of transport line under a driven way is to be double cased or equivalent.

Title: minimum land NOTICE TO TITLE
Wording This permit is granted based on the recorded RESTRICTIVE COVENANT combining lots .1-12.....of block..10.....,..HARRISBURG.......... to meet the minimum land area required under WAC 246-272 Onsite Sewage Code. COVENANT recorded...8/23/01............................

Title: risers
Wording Risers are required to grade with secured lids over the inlet and outlet of the septic tank. Minimum 24" riser over inlet.

Title: conventional system monitoring
Wording As per Jefferson County Code 8.15 all onsite sewage systems require monitoring. Monitoring shall be provided by an approved entity. THIS SYSTEM IS REQUIRED TO BE INSPECTED EVERY 3 YEARS.

Title: conventional-asbuilt required
Wording An asbuilt drawing and certification of completion by the installer is required prior to final approval.

Title: protective barriers
Wording Permanent barriers are required along/around primary and reserve drainfield areas to protect from parking, driving, and other land disturbing activities prior to final.

Title: riser on d-box
Wording Distribution boxes shall be fitted with a riser to grade, constructed of durable materials and a secured lid, adequately sized to allow visible inspection of the liquid level in the box.

Title: PERMITTED FOR ALL 12 LOTS
Wording This permit is approved for all 12 lots of the harrisburg subdivision. A boundary line adjustment is proposed to divide these lots into 4, 12,500 square foot parcels. Until the BLA is complete no other single family residence will be permitted on these parcels.

Title: Stormwater BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.