Description:
|
| | |
OSS Inspection-1 Year
|
|
Date Completed:
|
| | |
4/5/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-1 Year
|
|
Date Completed:
|
| | |
4/6/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-1 Year
|
|
Date Completed:
|
| | |
4/29/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-3 Year
|
|
Date Completed:
|
| | |
4/21/2004
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-Custom Schedule
|
|
Date Completed:
|
| | |
3/4/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-6 Months
|
|
Date Completed:
|
| | |
6/6/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
11/19/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pressure test required
|
|
Date Completed:
|
| | |
10/30/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
REDESIGN APPR-retain renewdate
|
|
Date Completed:
|
| | |
4/17/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Redesign Submitted no form
|
|
Date Completed:
|
| | |
2/27/2001
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue permit (F)
|
|
Date Completed:
|
| | |
9/13/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
8/25/2000
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Stormwater Review
|
|
Date Completed:
|
| | |
9/10/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Review Case
|
|
Date Completed:
|
| | |
9/10/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Critical Area Review
|
|
Date Completed:
|
| | |
9/10/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Permit Application (F)
|
|
Date Completed:
|
| | |
8/25/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
pud monitoring
|
|
Wording
|
| | |
AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test when system fully installed/complete, 48 hours notice to be provided for scheduling.
|
|
|
Title:
|
| | |
alternative-asbuilt required
|
|
Wording
|
| | |
An asbuilt drawing and certification of completion by the designer is required prior to final approval.
|
|
|
Title:
|
| | |
well setback requirement
|
|
Wording
|
| | |
Setbacks to all individual wells- 50' required from tanks and effluent transport lines.
Setbacks to all public wells- 100' required from all onsite sewage system components.
|
|
|
Title:
|
| | |
other setbacks req.
|
|
Wording
|
| | |
10 ft. separation required between water lines and effluent transport lines. If the lines must cross it shall be done as follows: The lies shall be perpendicular, the effluent transport line shall be a minimum of 18" below the water line and double cased.
|
|
|
Title:
|
| | |
protection from vehicular traffic
|
|
Wording
|
| | |
All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers are required.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage, including roof drains away from septic tank
|
|
|
Title:
|
| | |
transport line double cased
|
|
Wording
|
| | |
Any portion of transport line under a driven way is to be double cased or equivalent.
|
|
|
Title:
|
| | |
water tight tank
|
|
Wording
|
| | |
Asphaultic emulsion or equivalent required on septic tank and/or pump chamber.
|
|
|
Title:
|
| | |
no building permit guarantee
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.
|
|
|
Title:
|
| | |
critical area compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site.
|
|
|
Title:
|
| | |
risers
|
|
Wording
|
| | |
Risers are required to grade with secured lids over the inlet and outlet of the septic tank. Minimum 24" riser over inlet.
|
|
|
Title:
|
| | |
PUMP CHAMBER-NO HOLD
|
|
Wording
|
| | |
Pump chamber shall have riser to grade, panel provided with alarm, manual on switch and dose counter. Floats shall be provided on a freestanding post attached to the riser for accessibility. There shall be an alarm and an on/off float at a minimum. A redundant off/low level float may be provided.
|
|