Description:
|
| | |
Close Case/Retrn status to "F"
|
|
Date Completed:
|
| | |
9/20/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Sanit. Survey Complt. by JCPH
|
|
Date Completed:
|
| | |
12/28/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-1 Year
|
|
Date Completed:
|
| | |
12/19/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
4/13/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Reinspection
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue permit (F)
|
|
Date Completed:
|
| | |
9/14/1999
|
|
Disposition:
|
| | |
ISSU
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
8/16/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Stormwater Review
|
|
Date Completed:
|
| | |
9/14/1999
|
|
Disposition:
|
| | |
OKAY
|
|
|
Description:
|
| | |
Review Case
|
|
Date Completed:
|
| | |
9/14/1999
|
|
Disposition:
|
| | |
ISSU
|
|
|
Description:
|
| | |
Critical Area Review
|
|
Date Completed:
|
| | |
9/14/1999
|
|
Disposition:
|
| | |
OKAY
|
|
|
Description:
|
| | |
PUD contract required
|
|
Date Completed:
|
| | |
1/28/1994
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
AsBuilt from engineer req
|
|
Date Completed:
|
| | |
4/14/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pressure test required
|
|
Date Completed:
|
| | |
3/21/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Permit Application (F)
|
|
Date Completed:
|
| | |
8/16/1999
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test, 48 hour notice to be given.
|
|
|
Title:
|
| | |
other setbacks req.
|
|
Wording
|
| | |
5 ft. setback from property line to be maintained.
|
|
|
Title:
|
| | |
low use water fixures
|
|
Wording
|
| | |
Low use water fixtures recommended, 1.6 gal. flush toilets and 2.5 gpm shower heads.
|
|
|
Title:
|
| | |
dose counter
|
|
Wording
|
| | |
Dose counters are required in the control panel for all drainfield components.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage, including roof drains away from septic tank and drainfield area.
|
|
|
Title:
|
| | |
septic tank inspection
|
|
Wording
|
| | |
Existing tanks must meet current regulations. Health Department must verify septic tank and pump chamber during pressure test of sandfilter.
|
|
|
Title:
|
| | |
no building permit guarantee
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.
|
|
|
Title:
|
| | |
critical area compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site.
|
|
|
Title:
|
| | |
risers
|
|
Wording
|
| | |
Risers are required to grade with secured lids over the inlet and outlet of the septic tank. Minimum 24" riser over inlet.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Sandfilter linner to be no deeper than 6 inches below existing grade.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Existing control pannel must have dose counters timmers and runtime meters to meet todays requirements.
|
|