Permit Case Summary

Case Number: Search Help

Case Number:SEP1999-00188 Case Status:Finaled Date Received:6/29/1999
Description:lot 12 Date Issued:11/12/1999
Applicant: SNOWATER LLC Expiration Date:11/12/2001 12:00:00 AM
Site Address:117 HADLOCK BAY RD Case Finaled:12/4/2001
Parcel No:901122011 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: OSS Inspection-5 Year
Date Completed: 3/4/2010
Disposition: DONE
Description: OSS Inspection-2 Year
Date Completed: 4/26/2007
Disposition: DONE
Description: OSS Inspection-3 Year
Date Completed: 4/4/2005
Disposition: DONE
Description: OSS Inspection-Custom Schedule
Date Completed: 4/28/2003
Disposition: DONE
Description: OSS Inspection-6 Months
Date Completed: 9/17/2002
Disposition: DONE
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 12/4/2001
Disposition: DONE
Description: Renewal Notice Printed (F)
Date Completed: 11/6/2001
Disposition: DONE
Description: Renew Permit
Date Completed: 11/16/2000
Disposition: DONE
Description: Renewal Notice Printed (F)
Date Completed: 11/7/2000
Disposition: DONE
Description: Renewal Notice Printed (F)
Date Completed: 11/1/2000
Disposition: DONE
Description: Issue permit (F)
Date Completed: 11/12/1999
Disposition: ISS
Description: Pending letter; add inf (F)
Date Completed: 11/2/1999
Disposition: PD
Description: Case Entered
Date Completed: 6/29/1999
Disposition:
Description: Stormwater Review
Date Completed: 7/2/1999
Disposition:
Description: Review Case
Date Completed: 11/12/1999
Disposition: ISS
Description: Critical Area Review
Date Completed: 8/10/1999
Disposition: OKAY
Description: Inspection
Date Completed: 3/10/2000
Disposition: DONE
Description: PUD contract required
Date Completed: 12/4/2001
Disposition: DONE
Description: AsBuilt from engineer req
Date Completed: 11/29/2001
Disposition: DONE
Description: Pressure test required
Date Completed: 11/29/2001
Disposition: DONE
Description: Septic Permit Application (F)
Date Completed: 6/30/1999
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.

Title: pressure test observation
Wording Health Dept. required to observe pressure test, 48 hour notice to be given.

Title: well setback requirement
Wording Setbacks to all wells- 100' required from drainfield and reserve areas. 50' required from tanks and effluent transport lines.

Title: other setbacks req.
Wording 100 ft. setback from surface waters to Glendon to be maintained. 50' setback from surface waters to tanks required.

Title: dry season installation
Wording Dry season installation required.

Title: easement
Wording Recorded easement required for primary and/or reserve drainfield components prior to final. Easement to be recorded with the Jefferson County Auditors office.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers are required around drainfield. 30 FT ZONE DOWNGRADIENT OF SYSTEM AND RESERVE TO BE PROTECTED FROM LAND DISTURBING ACTIVITIES, PARKING, DRIVING, GRADING, ETC.

Title: installed on natural contours
Wording Drainlines are to be installed along the natural contours.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: transport line double cased
Wording Transport line is to be double cased a minimum of 10' on either side of the stream crossing. Any portion of transport line under a driven way is to be double cased or equivalent.

Title: water tight tank
Wording Asphaultic emulsion or equivalent required on septic tank and/or pump chamber.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: critical area compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site.

Title: critical area waiver cond.
Wording Compliance with the conditions of the signed Critical Area Waiver is required.