Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
7/25/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Monitoring Agreemt Sent (Fm)
|
|
Date Completed:
|
| | |
7/24/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Mon Agreement ATU Attach (Fm)
|
|
Date Completed:
|
| | |
7/24/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
AsBuilt from engineer req
|
|
Date Completed:
|
| | |
3/28/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
VIOLATION/COMPLIANCE Letter
|
|
Date Completed:
|
| | |
7/25/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-1 Year
|
|
Date Completed:
|
| | |
2/13/2006
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Incomplete Installation "I"
|
|
Date Completed:
|
| | |
7/25/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Incomplete Installation "I"
|
|
Date Completed:
|
| | |
8/19/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-6 Months
|
|
Date Completed:
|
| | |
2/6/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
OSS Inspection-1 Year
|
|
Date Completed:
|
| | |
10/2/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Redesign APPR & ISSUED-newdate
|
|
Date Completed:
|
| | |
8/7/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Print ESA Review Form-F
|
|
Date Completed:
|
| | |
7/17/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
REDESIGN SUBMITTED (F)
|
|
Date Completed:
|
| | |
8/7/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
7/27/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
7/10/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
7/21/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
7/10/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue permit (F)
|
|
Date Completed:
|
| | |
7/27/1999
|
|
Disposition:
|
| | |
ISS
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
6/15/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Stormwater Review
|
|
Date Completed:
|
| | |
6/29/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Review Case
|
|
Date Completed:
|
| | |
7/27/1999
|
|
Disposition:
|
| | |
ISS
|
|
|
Description:
|
| | |
Critical Area Review
|
|
Date Completed:
|
| | |
6/29/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Pressure test required
|
|
Date Completed:
|
| | |
5/14/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
REDESIGN SUBMITTED (F)
|
|
Date Completed:
|
| | |
6/18/1999
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
pud monitoring
|
|
Wording
|
| | |
AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test when system fully installed/complete, 48 hours notice to be provided for scheduling.
|
|
|
Title:
|
| | |
well setback requirement
|
|
Wording
|
| | |
Setbacks to all wells- 100' required from drainfield and reserve areas. 50' required from tanks and effluent transport lines.
|
|
|
Title:
|
| | |
other setbacks req.
|
|
Wording
|
| | |
50 ft. setback from surface water to be maintained from tanks and sandfilter basin.
|
|
|
Title:
|
| | |
reserve area, alternative
|
|
Wording
|
| | |
When/if designated reserve area is utilized an alternative system providing an additional level of treatment may be required.
|
|
|
Title:
|
| | |
low use water fixures
|
|
Wording
|
| | |
Low use water fixtures required, 1.6 gal. flush toilets and 2.5 gpm shower heads.
|
|
|
Title:
|
| | |
protection from vehicular traffic
|
|
Wording
|
| | |
All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers are required around drainfield.
|
|
|
Title:
|
| | |
staking of drainfield
|
|
Wording
|
| | |
Contact designer prior to installation for staking of drainfield area.
|
|
|
Title:
|
| | |
dose counter
|
|
Wording
|
| | |
Dose counters are required in the control panel for all drainfield components.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage, including roof drains away from septic tank and drainfield area.
|
|
|
Title:
|
| | |
water tight tank
|
|
Wording
|
| | |
Asphaultic emulsion or equivalent required on septic tank and/or pump chamber.
|
|
|
Title:
|
| | |
nonconforming repair
|
|
Wording
|
| | |
This system does not conform to current code. It is a Table VI repair and is required to meet treatment standard 1. It does not meet the standards of WAC 246-272 in the following manner: The disposal component is less than 50' from surface water and has less than 12" of vertical separation. A copy of this permit is recorded with the Jefferson County Auditor.
|
|
|
Title:
|
| | |
marine expansion
|
|
Wording
|
| | |
Marine expansions as defined by WAC 246-272-010 (12) are prohibited under a Table VI repair.
|
|
|
Title:
|
| | |
treatment standard
|
|
Wording
|
| | |
This system meets Treatment Standard I as per State Guidelines and requires annual monitoring.
|
|
|
Title:
|
| | |
no building permit guarantee
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.
|
|
|
Title:
|
| | |
critical area compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site.
|
|
|
Title:
|
| | |
UDC compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site.
|
|
|
Title:
|
| | |
critical area waiver cond.
|
|
Wording
|
| | |
Compliance with the conditions of the signed Critical Area Waiver is required.
|
|
|
Title:
|
| | |
domestic strength waste
|
|
Wording
|
| | |
This onsite sewage system is designed for domestic strength waste water only. Disposal of any other waste streams is considered a violation of this permit.
|
|
|
Title:
|
| | |
AEROBIC TREATMENT SYS MANAGEMENT
|
|
Wording
|
| | |
This onsite sewage system is permitted using an aerobic treatment unit (ATU) with UV disinfection. All ATU systems must have a continuous and perpetual management agreement in place for the life of the system. This management shall be provided by the Jefferson County PUD #1. A signed contract with PUD shall be required prior to final approval.
|
|
|
Title:
|
| | |
ATU maintenance
|
|
Wording
|
| | |
Maintenance of the system shall be completed by a manufacturers authorized representative at the frequency required by the manufacturer. That frequency may be increased to meet State requirements for Treatment Standard 1 systems.
|
|
|
Title:
|
| | |
ATU contract recordng/ compliance
|
|
Wording
|
| | |
The signed maintenance contract with the manufacturer's authorized representative shall be recorded to the property title prior to final approval. Non-compliance with the contract or maintenance requirements is a violation of this permit.
|
|
|
Title:
|
| | |
Water line setback
|
|
Wording
|
| | |
10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components.
|
|
|
Title:
|
| | |
VIOLATION-limited permit life
|
|
Wording
|
| | |
This permit was issued to correct a violation of WAC 246-272. The permit must be completed within 90 days of the date of issuance.
|
|
|
Title:
|
| | |
Stormwater BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|