Description:
|
| | |
OSS Inspection-6 Months
|
|
Date Completed:
|
| | |
7/27/2007
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
1/13/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
7/26/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
7/28/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
7/26/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue permit (F)
|
|
Date Completed:
|
| | |
8/4/1999
|
|
Disposition:
|
| | |
ISS
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
6/15/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Stormwater Review
|
|
Date Completed:
|
| | |
6/22/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Review Case
|
|
Date Completed:
|
| | |
8/4/1999
|
|
Disposition:
|
| | |
ISS
|
|
|
Description:
|
| | |
Critical Area Review
|
|
Date Completed:
|
| | |
6/22/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Septic Permit Application (F)
|
|
Date Completed:
|
| | |
6/16/1999
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
pud monitoring
|
|
Wording
|
| | |
AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test, 48 hour notice to be given.
|
|
|
Title:
|
| | |
well setback requirement
|
|
Wording
|
| | |
Setbacks to all wells- 100' required from drainfield and reserve areas. 50' required from tanks and effluent transport lines.
|
|
|
Title:
|
| | |
trench depth
|
|
Wording
|
| | |
MAXIMUM TRENCH DEPTH 12 INCHES
|
|
|
Title:
|
| | |
protection from vehicular traffic
|
|
Wording
|
| | |
All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers are required around drainfield.
|
|
|
Title:
|
| | |
dose counter
|
|
Wording
|
| | |
Dose counters are required in the control panel for all drainfield components.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage, including roof drains away from septic tank and drainfield area.
|
|
|
Title:
|
| | |
transport line double cased
|
|
Wording
|
| | |
Any portion of transport line under a driven way is to be double cased or equivalent.
|
|
|
Title:
|
| | |
water tight tank
|
|
Wording
|
| | |
Asphaultic emulsion or equivalent required on septic tank and/or pump chamber.
|
|
|
Title:
|
| | |
no building permit guarantee
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.
|
|
|
Title:
|
| | |
critical area compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site.
|
|
|
Title:
|
| | |
reduced size df
|
|
Wording
|
| | |
Performance monitoring schedule for treatment systems followed by reduced sized drainfield/infiltrative area shall be :1) Two times per year (once every six months) during the first and second year following installation. 2) One time per year beginning with the third year following installation. 3) In response to complaints or problems. Observation ports to the bottom of the trench are to be installed in at least two places on each drainfield line: One within 10 feet of the beginning of each line and one within 10 feet of the end of each line.
|
|
|
Title:
|
| | |
conventional-asbuilt required
|
|
Wording
|
| | |
An asbuilt drawing and certification of completion by the installer is required prior to final approval.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
This system is designed using Best Management Practices for the reduction of nitrogen due to the location of the site in a well head protection area and having excessively well drained soils. BMP's are required per Administrative Rules of the Critical Area Ord. 14-1626-95.
|
|