Permit Case Summary

Case Number: Search Help

Case Number:SEP1999-00065 Case Status:Canceled Date Received:3/17/1999
Description:FILED WITH SEP04-251 Date Issued:4/26/1999
Applicant: BISHOP LOGGING Expiration Date:4/26/2002 12:00:00 AM
Site Address:83 SYCAMORE ST Case Finaled:
Parcel No:932300024 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Cancel/withdraw application
Date Completed: 4/2/2002
Disposition: DONE
Description: Renew Permit
Date Completed: 4/13/2001
Disposition: DONE
Description: Renewal Notice Printed (F)
Date Completed: 4/10/2001
Disposition: DONE
Description: Renew Permit
Date Completed: 4/3/2000
Disposition: DONE
Description: Renewal Notice Printed (F)
Date Completed: 3/27/2000
Disposition: DONE
Description: Issue permit (F)
Date Completed: 4/26/1999
Disposition: ISS
Description: Issue permit (F)
Date Completed: 4/26/1999
Disposition: ISS
Description: Case Entered
Date Completed: 3/17/1999
Disposition:
Description: Stormwater Review
Date Completed: 3/23/1999
Disposition:
Description: Review Case
Date Completed: 4/26/1999
Disposition: ISS
Description: Critical Area Review
Date Completed: 3/23/1999
Disposition:
Description: PUD contract required
Date Completed:
Disposition:
Description: AsBuilt from engineer req
Date Completed:
Disposition:
Description: Pressure test required
Date Completed:
Disposition:
Description: Septic Permit Application (F)
Date Completed: 3/17/1999
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.

Title: pressure test observation
Wording Health Dept. required to observe pressure test, 48 hour notice to be given.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers are required around drainfield.

Title: installed on natural contours
Wording Drainlines are to be installed along the natural contours.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage, including roof drains away from septic tank and drainfield area.

Title: water tight tank
Wording Asphaultic emulsion or equivalent required on septic tank and/or pump chamber.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: critical area compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site.

Title: reduced size df
Wording Performance monitoring schedule for treatment systems followed by reduced sized drainfield/infiltrative area shall be :1) Two times per year (once every six months) during the first and second year following installation. 2) One time per year beginning with the third year following installation. 3) In response to complaints or problems. Observation ports to the bottom of the trench are to be installed in at least two places on each drainfield line: One within 10 feet of the beginning of each line and one within 10 feet of the end of each line.

Title: CUSTOM CONDITION
Wording Trench depth 12" - 18" maximum to enhance nitrogen uptake.