Permit Case Summary

Case Number: Search Help

Case Number:SEP1997-00311 Case Status:Canceled Date Received:12/22/1997
Description:this file is with sep01-00173, 9/26/01 sp Date Issued:3/17/1998
Applicant:MIKE CLARKE Expiration Date:3/17/2001 12:00:00 AM
Site Address:161 ANN KIVLEY DR Case Finaled:
Parcel No:972000025 Other Cases Parcel Data Map It More Details

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Cancel/withdraw application
Date Completed: 3/1/2001
Disposition: DONE
Description: Renew Permit
Date Completed: 3/16/2000
Disposition: DONE
Description: Renewal Notice Printed (F)
Date Completed: 3/6/2000
Disposition: DONE
Description: Renew Permit
Date Completed: 3/12/1999
Disposition:
Description: Renewal Notice Printed (F)
Date Completed: 2/26/1999
Disposition:
Description: Issue permit (F)
Date Completed: 3/17/1998
Disposition: ISS
Description: Pending letter; add inf (F)
Date Completed: 2/17/1998
Disposition: P
Description: Case Entered
Date Completed: 12/22/1997
Disposition:
Description: Stormwater Review
Date Completed: 12/29/1997
Disposition:
Description: Review Case
Date Completed: 3/17/1998
Disposition: ISS
Description: Critical Area Review
Date Completed: 12/29/1997
Disposition:
Description: Septic Permit Application (F)
Date Completed: 12/23/1997
Disposition:
Description: PUD contract required
Date Completed:
Disposition:
Description: AsBuilt from engineer req
Date Completed:
Disposition:
Description: Pressure test required
Date Completed:
Disposition:
Description: Easement required
Date Completed:
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.

Title: pressure test observation
Wording Health Dept. required to observe pressure test, 48 hour notice to be given.

Title: curtain drain
Wording Drain ditch required a minimum of 10' upgradient of primary and reserve mound areas.

Title: dry season installation
Wording Dry season installation required.

Title: easement
Wording Recorded easement required for primary and/or reserve drainfields prior to final. Easement to be recorded with the Jefferson County Auditors office.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers are required around drainfield.

Title: installed on natural contours
Wording Drainlines are to be installed along the natural contours.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage away from septic tank and drainfield area.

Title: transport line double cased
Wording Any portion of transport line under a driven way is to be double cased or equivalent.

Title: water tight tank
Wording Asphaultic emulsion or equivalent required on septic tank and/or pump chamber.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of other development or a building permit on this site. Compliance with other Jefferson County and Washington State Codes is required.

Title: critical area compliance
Wording Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site.

Title: reduced size df
Wording Performance monitoring schedule for sand filter followed by reduced sized drainfield shall be :1) Two times per year (once every six months) during the first and second year following installation. 2) One time per year beginning with the third year following installation. 3) In response to complaints or problems. Observation ports to the bottom of the trench are to be installed in at least two places on each drainfield line: One within 10 feet of the beginning of each line and one within 10 feet of the end of each line.

Title: minimum land NOTICE TO TITLE
Wording This permit is granted based on the combination of lots 25 and 26 of MELWOOD TERRACE under parcel # 972-000-025 as of February 17, 1998 to meet the minimum land area required under WAC 246-272 Onsite Sewage Code.

Title: risers
Wording Risers are required to grade with secured lids over the inlet and outlet of the septic tank. Minimum 24" riser over inlet.