Permit Case Summary

Case Number: Search Help

Case Number:SEP1995-00247 Case Status:Finaled Date Received:8/2/1995
Description: Date Issued:8/30/1995
Applicant:DONNA EASTON Expiration Date:8/30/1996 12:00:00 AM
Site Address:165 RHODY CT Case Finaled:1/7/1997
Parcel No:963100010 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: OSS Inspection-Custom Schedule
Date Completed: 4/17/2003
Disposition: DONE
Description: PUD contract required
Date Completed: 2/25/1999
Disposition:
Description: SEPTIC PERMIT FINALED "F"
Date Completed: 1/7/1997
Disposition:
Description: Res Bld Permit Finaled "1"
Date Completed: 9/24/1996
Disposition:
Description: Partial Final/cont Renewal "T"
Date Completed: 8/7/1996
Disposition:
Description: Renewal Notice Printed (F)
Date Completed: 7/22/1996
Disposition:
Description: Issue permit (F)
Date Completed: 8/30/1995
Disposition: ISSU
Description: Case Entered
Date Completed: 8/2/1995
Disposition:
Description: Review Case
Date Completed: 8/30/1995
Disposition: ISSU
Description: Critical Area Review Complete
Date Completed: 8/8/1995
Disposition:
Description: Septic Permit Application (F)
Date Completed: 8/3/1995
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.

Title: pressure test observation
Wording Health Dept. required to observe pressure test, 48 hour notice to be given.

Title: setback requirement
Wording 5 ft. setback of septic tank to property lines and building foundation must be maintained

Title: setback requirement
Wording 10 ft. setback of drainfield to building foundation and 5 ft. to property lines must be maintained

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: transport line double cased
Wording Any portion of transport line under a driven way is to be double cased or equivalent.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of a building permit on this site.