Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
6/3/1997
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
4/17/1997
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
5/16/1996
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
4/29/1996
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue permit (F)
|
|
Date Completed:
|
| | |
5/21/1995
|
|
Disposition:
|
| | |
ISS
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
9/6/1994
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Review Case
|
|
Date Completed:
|
| | |
10/25/1994
|
|
Disposition:
|
| | |
PO
|
|
|
Description:
|
| | |
Critical Area Review Complete
|
|
Date Completed:
|
| | |
5/19/1995
|
|
Disposition:
|
| | |
NCAS
|
|
|
Title:
|
| | |
reserve area, alternative
|
|
Wording
|
| | |
When/if designated reserve area is utilized an alternative system may be required.
|
|
|
Title:
|
| | |
protection from vehicular traffic
|
|
Wording
|
| | |
All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers are required around drainfield.
|
|
|
Title:
|
| | |
installed on natural contours
|
|
Wording
|
| | |
Drainlines are to be installed along the natural contours.
|
|
|
Title:
|
| | |
transport line double cased
|
|
Wording
|
| | |
Any portion of transport line under a driven way is to be double cased or equivalent.
|
|
|
Title:
|
| | |
water tight tank
|
|
Wording
|
| | |
Asphaultic emulsion or equivalent required on septic tank and/or pump chamber.
|
|
|
Title:
|
| | |
no building permit guarantee
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit does not guarantee the approval of a building permit on this site.
|
|
|
Title:
|
| | |
critical area compliance
|
|
Wording
|
| | |
Approval of this sewage disposal permit does not preclude the permit holder from complying with the Critical Areas Ordinance for other development on the site.
|
|