Permit Case Summary

Case Number: Search Help

Case Number:SEP1994-00194 Case Status:Finaled Date Received:5/18/1994
Description: Date Issued:8/4/1994
Applicant:HAROLD MOE Expiration Date:8/4/1995 12:00:00 AM
Site Address:153 RHODY CT Case Finaled:10/18/1994
Parcel No:963100011 Other Cases Parcel Data Map It More Details Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Septic Permit Finaled
Date Completed: 10/18/1994
Disposition:
Description: Issue permit (F)
Date Completed: 8/4/1994
Disposition: ISS
Description: Case Entered
Date Completed: 5/18/1994
Disposition:
Description: Review Case
Date Completed: 7/27/1994
Disposition: PD
Description: Septic Permit Application (F)
Date Completed: 5/19/1994
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: pud monitoring
Wording AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.

Title: pressure test observation
Wording Health Dept. required to observe pressure test, 48 hour notice to be given.

Title: setback requirement
Wording Maintain a minimum setback of 5 feet from property lines, and 10 feet from water lines with the drainfield areas.

Title: protection from vehicular traffic
Wording All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers may be required around drainfield areas.

Title: staking of drainfield
Wording Contact designer prior to installation for staking of drainfield area and the required inspections for the certification of the sewage disposal system.

Title: dose counter
Wording Dose counters are required in the control panel for all drainfield components.

Title: divert drainage
Wording Divert all sources of drainage away from septic tank/pump chamber and the drainfield areas.

Title: no building permit guarantee
Wording Approval/issuance of a sewage disposal permit does not guarantee the approval of a building permit on this site.