|
Description:
|
| | |
Sys in Violation Status "V"
|
|
Date Completed:
|
| | |
7/20/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Misc. Conversation or email
|
|
Date Completed:
|
| | |
7/20/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Sanit.Survey Attempted by JCPH
|
|
Date Completed:
|
| | |
2/2/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Close Case "F"
|
|
Date Completed:
|
| | |
4/20/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
PUD contract required
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
AsBuilt from engineer req
|
|
Date Completed:
|
| | |
9/29/1994
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Pressure test required
|
|
Date Completed:
|
| | |
8/17/1994
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
VIOLATION/COMPLIANCE Letter
|
|
Date Completed:
|
| | |
6/17/1997
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
6/24/1996
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
PUD Monitoring Contract ltr"L"
|
|
Date Completed:
|
| | |
6/24/1996
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Partial Final/cont renewal "T"
|
|
Date Completed:
|
| | |
12/21/1995
|
|
Disposition:
|
| | |
T
|
|
|
Description:
|
| | |
Issue permit (F)
|
|
Date Completed:
|
| | |
7/7/1994
|
|
Disposition:
|
| | |
ISS
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
3/4/1994
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Review Case
|
|
Date Completed:
|
| | |
7/7/1994
|
|
Disposition:
|
| | |
ISS
|
|
|
Description:
|
| | |
Septic Permit Application (F)
|
|
Date Completed:
|
| | |
3/18/1994
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
pud monitoring
|
|
Wording
|
| | |
AS PER WAC 246-272 ALL ALTERNATIVE SYSTEMS REQUIRE MONITORING. THIS MONITORING IS PROVIDED BY AGREEMENT BETWEEN THE JEFFERSON COUNTY ENVIRONMENTAL HEALTH DIVISION AND THE JEFFERSON COUNTY PUBLIC UTILITY DISTRICT #1. THIS SEWAGE DISPOSAL SYSTEM WILL REQUIRE AN ACTIVE MONITORING CONTRACT WITH THE PUD #1 PRIOR TO FINAL APPROVAL OF THE SEWAGE DISPOSAL SYSTEM.
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test, 48 hour notice to be given.
|
|
|
Title:
|
| | |
setback requirement
|
|
Wording
|
| | |
100 ft. setback to surface water to be maintained
|
|
|
Title:
|
| | |
dry season installation
|
|
Wording
|
| | |
Dry season installation required.
|
|
|
Title:
|
| | |
trench depth
|
|
Wording
|
| | |
MAXIMUM TRENCH DEPTH 9 INCHES
|
|
|
Title:
|
| | |
low use water fixures
|
|
Wording
|
| | |
Low use water fixtures required, 1.6 gal. flush toilets and 2.5 gpm shower heads.
|
|
|
Title:
|
| | |
protection from vehicular traffic
|
|
Wording
|
| | |
All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers are required around drainfield.
|
|
|
Title:
|
| | |
staking of drainfield
|
|
Wording
|
| | |
Contact designer prior to installation for staking of drainfield area.
|
|
|
Title:
|
| | |
dose counter
|
|
Wording
|
| | |
Dose counters are required in the control panel for all drainfield components.
|
|
|
Title:
|
| | |
divert drainage
|
|
Wording
|
| | |
Divert all sources of drainage away from septic tank and drainfield area.
|
|
|
Title:
|
| | |
transport line double cased
|
|
Wording
|
| | |
Any portion of transport line under a driven way is to be double cased or equivalent.
|
|
|
Title:
|
| | |
water tight tank
|
|
Wording
|
| | |
Asphaultic emulsion or equivalent required on septic tank and/or pump chamber.
|
|
|
Title:
|
| | |
no building permit guarantee
|
|
Wording
|
| | |
Approval/issuance of a sewage disposal permit does not guarantee the approval of a building permit on this site.
|
|