Description:
|
| | |
OSS Inspection-6 Months
|
|
Date Completed:
|
| | |
5/4/2005
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
SEPTIC PERMIT FINALED "F"
|
|
Date Completed:
|
| | |
9/28/2004
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Incomplete Installation "I"
|
|
Date Completed:
|
| | |
3/1/2002
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
10/10/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
3/11/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
2/26/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
2/26/1998
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
PUD contract required
|
|
Date Completed:
|
| | |
1/31/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
AsBuilt from engineer req
|
|
Date Completed:
|
| | |
9/27/2004
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pressure test required
|
|
Date Completed:
|
| | |
12/12/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
2/2/1998
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
3/14/1997
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
2/24/1997
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
3/7/1996
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
2/27/1996
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renew Permit
|
|
Date Completed:
|
| | |
4/18/1995
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Renewal Notice Printed (F)
|
|
Date Completed:
|
| | |
2/28/1995
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
2/22/1994
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Review Case
|
|
Date Completed:
|
| | |
3/9/1994
|
|
Disposition:
|
| | |
PP
|
|
|
Description:
|
| | |
Septic Permit Application (F)
|
|
Date Completed:
|
| | |
2/24/1994
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue permit (F)
|
|
Date Completed:
|
| | |
3/14/1994
|
|
Disposition:
|
| | |
ISS
|
|
|
Title:
|
| | |
pud monitoring
|
|
Wording
|
| | |
PUD monitoring contract is required
|
|
|
Title:
|
| | |
pressure test observation
|
|
Wording
|
| | |
Health Dept. required to observe pressure test, 48 hour notice to be given.
|
|
|
Title:
|
| | |
setback requirement
|
|
Wording
|
| | |
100 ft. setback to surface water to be maintained
|
|
|
Title:
|
| | |
low use water fixures
|
|
Wording
|
| | |
Low use water fixtures required, 1.6 gal. flush toilets and 2.5 gpm shower heads.
|
|
|
Title:
|
| | |
protection from vehicular traffic
|
|
Wording
|
| | |
All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Protective barriers are required around drainfield.
|
|
|
Title:
|
| | |
dose counter
|
|
Wording
|
| | |
Dose counters are required in the control panel for all drainfield components.
|
|
|
Title:
|
| | |
transport line double cased
|
|
Wording
|
| | |
Any portion of transport line under a driven way is to be double cased or equivalent.
|
|
|
Title:
|
| | |
water tight tank
|
|
Wording
|
| | |
Asphaultic emulsion or equivalent required on septic tank and/or pump chamber.
|
|