Title:
|
| | |
Other Work/Separate Approval
|
|
Wording
|
| | |
Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.
|
|
|
Title:
|
| | |
Min Use of Hazardous Materials
|
|
Wording
|
| | |
The design, location, and construction of docks, piers, and floats, as well as their subsequent use, shall avoid adverse effects on fish, shellfish, wildlife, marine vegetation, water quality, and geohydraulic processes. Construction methods shall minimize the use of materials hazardous to the environment.
|
|
|
Title:
|
| | |
Site Plan
|
|
Wording
|
| | |
Construction shall be in substantial compliance with the site plan submitted on March 24, 2021 as it exists now or is hereafter amended by Jefferson County and/or the Washington Department of Ecology.
|
|
|
Title:
|
| | |
Progress towards completion
|
|
Wording
|
| | |
Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.
|
|
|
Title:
|
| | |
NO SHOOTING AREA
|
|
Wording
|
| | |
This parcel is within a no shooting area per JCC 8.50.
|
|
|
Title:
|
| | |
Exempt Maintenance Condition
|
|
Wording
|
| | |
The development shall be essentially the same as the original in location, size, configuration, and external appearance.
|
|
|
Title:
|
| | |
No Fill or Other Material
|
|
Wording
|
| | |
No fill or other material may be placed in the waters or intertidal areas of Jefferson County.
|
|
|
Title:
|
| | |
Follow Flood Ordinance
|
|
Wording
|
| | |
Flood hazard reduction measures are to be used as required by the Jefferson County Code Chapter 15.15.
|
|
|
Title:
|
| | |
Res Construction Flood Damage
|
|
Wording
|
| | |
Construction materials and methods of construction to reduce flood hazard shall be implemented, including:
(i) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage; and
(ii) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage.
|
|
|
Title:
|
| | |
F-PROPOSAL
|
|
Wording
|
| | |
The proposal is to conduct routine maintenance and repair of an existing floating dock. Two existing piles will be replaced with pile guides. The work will be conducted in a segment of the Triton Cove shoreline that is designated as conservancy above ordinary high water mark and aquatic below.
|
|
|
Title:
|
| | |
F-FLOOD
|
|
Wording
|
| | |
The proposal will occur in Triton Cove, in an areas that is mapped on the Federal Emergency Management Agency Flood Insurance Rate Map (Panel 52031C1655C) as Zone AE. The proposed project is subject to the requirement for a flood development permit, which is incorporated into this decision. The proposal meets the definition of development, but not structure, in JCC 15.15.050.
|
|
|
Title:
|
| | |
F-SEPA STATE PARKS
|
|
Wording
|
| | |
Acting as the State Environmental Policy Act (SEPA) lead agency for this proposal, Washington State Parks and Recreation Commission determined that the proposal is categorically exempt from SEPA review on December 27, 2019 under WAC 197-11-800(3).
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The Geographic Information Systems mapping review identified the following Critical Areas on the subject property: geologically hazardous areas (unstable and intermediate shoreline slope stability); fish and wildlife habitat conservation areas (maine water serves as a primary association for list marine species); frequently flooded area; critical aquifer recharge area (CARA, special aquifer recharge protection area plus unknown); seawater intrusion protection zone (SIPZ, coastal).
Critical area reports are not required for maintenance and repair shoreline exemptions so no geotechnical report or habitat management plan was requested. Shorelines mapped as a CARA or a SIPZ do not trigger submittal of a special report.
The applicants submitted a Biological Assessment prepared by Moffatt & Nichol (dated December 24, 2019) to addressfederally-listed species. This proposal requires a federal permitfrom U.S. Army Corps of Engineers (Corps) and the proposal is reviewed at the federal level for compliance wit the Endangered Species Act. Therefore, compliance with the Federal Emergency Management Agency (FEMA) Biological Opinion (BiOp) will be reviewed as part of federal permitting and the applicant is required to comply with the permit issued by the Corps.
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan, as submitted with the shoreline exemption application on March 24, 2021, has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated May 13, 2021 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for maintenance and repair of an existing structure only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
F-SDP Exemption Section
|
|
Wording
|
| | |
The Development Review Division finds that this proposal is consistent with JCC 18.25.560(2) and is consequently exempt from the substantial development permit requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.
|
|