Permit Case Summary

Case Number: Search Help

Case Number:SDP2021-00002 Case Status: Date Received:3/24/2021
Description:Shoreline exemption and flood development permit to maintain and repair an existing structure in Triton Cove. The proposal is to replace two guide piles. Date Issued:5/13/2021
Applicant: WASHINGTON STATE PARKS & Expiration Date:5/13/2026 12:00:00 AM
Site Address:314515 HWY 101 Case Finaled:
Parcel No:502313013 Other Cases Parcel Data Map It Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 5/13/2021
Disposition: DONE
Description: Consistency Review-U
Date Completed: 5/13/2021
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 5/13/2021
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 4/27/2021
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 5/13/2021
Disposition: DONE
Description: Case Entered
Date Completed: 4/13/2021
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Min Use of Hazardous Materials
Wording The design, location, and construction of docks, piers, and floats, as well as their subsequent use, shall avoid adverse effects on fish, shellfish, wildlife, marine vegetation, water quality, and geohydraulic processes. Construction methods shall minimize the use of materials hazardous to the environment.

Title: Site Plan
Wording Construction shall be in substantial compliance with the site plan submitted on March 24, 2021 as it exists now or is hereafter amended by Jefferson County and/or the Washington Department of Ecology.

Title: Progress towards completion
Wording Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.

Title: NO SHOOTING AREA
Wording This parcel is within a no shooting area per JCC 8.50.

Title: Exempt Maintenance Condition
Wording The development shall be essentially the same as the original in location, size, configuration, and external appearance.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: Follow Flood Ordinance
Wording Flood hazard reduction measures are to be used as required by the Jefferson County Code Chapter 15.15.

Title: Res Construction Flood Damage
Wording Construction materials and methods of construction to reduce flood hazard shall be implemented, including: (i) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage; and (ii) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-PROPOSAL
Wording The proposal is to conduct routine maintenance and repair of an existing floating dock. Two existing piles will be replaced with pile guides. The work will be conducted in a segment of the Triton Cove shoreline that is designated as conservancy above ordinary high water mark and aquatic below.

Title: F-FLOOD
Wording The proposal will occur in Triton Cove, in an areas that is mapped on the Federal Emergency Management Agency Flood Insurance Rate Map (Panel 52031C1655C) as Zone AE. The proposed project is subject to the requirement for a flood development permit, which is incorporated into this decision. The proposal meets the definition of development, but not structure, in JCC 15.15.050.

Title: F-SEPA STATE PARKS
Wording Acting as the State Environmental Policy Act (SEPA) lead agency for this proposal, Washington State Parks and Recreation Commission determined that the proposal is categorically exempt from SEPA review on December 27, 2019 under WAC 197-11-800(3).

Title: F-Confirmed ESAs
Wording The Geographic Information Systems mapping review identified the following Critical Areas on the subject property: geologically hazardous areas (unstable and intermediate shoreline slope stability); fish and wildlife habitat conservation areas (maine water serves as a primary association for list marine species); frequently flooded area; critical aquifer recharge area (CARA, special aquifer recharge protection area plus unknown); seawater intrusion protection zone (SIPZ, coastal). Critical area reports are not required for maintenance and repair shoreline exemptions so no geotechnical report or habitat management plan was requested. Shorelines mapped as a CARA or a SIPZ do not trigger submittal of a special report. The applicants submitted a Biological Assessment prepared by Moffatt & Nichol (dated December 24, 2019) to addressfederally-listed species. This proposal requires a federal permitfrom U.S. Army Corps of Engineers (Corps) and the proposal is reviewed at the federal level for compliance wit the Endangered Species Act. Therefore, compliance with the Federal Emergency Management Agency (FEMA) Biological Opinion (BiOp) will be reviewed as part of federal permitting and the applicant is required to comply with the permit issued by the Corps.

Title: F-Site Plan Changes
Wording The site plan, as submitted with the shoreline exemption application on March 24, 2021, has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated May 13, 2021 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for maintenance and repair of an existing structure only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with JCC 18.25.560(2) and is consequently exempt from the substantial development permit requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.