Description:
|
| | |
Status updtd - Energov Convrsn
|
|
Date Completed:
|
| | |
10/4/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Miscellaneous action
|
|
Date Completed:
|
| | |
6/22/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve SDP Permit-UF
|
|
Date Completed:
|
| | |
6/2/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Ntc of App +30-Publish-UF
|
|
Date Completed:
|
| | |
4/13/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Ntc of App +30-APO-UF
|
|
Date Completed:
|
| | |
4/13/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
6/2/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
6/2/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
6/2/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
4/9/2020
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
3/23/2020
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
Other Work/Separate Approval
|
|
Wording
|
| | |
Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.
|
|
|
Title:
|
| | |
BLD
|
|
Wording
|
| | |
The applicant shall obtain a building permit (BLD20-00223) and certificate of occupancy prior to use.
|
|
|
Title:
|
| | |
MITIGATION PLANTING PLAN
|
|
Wording
|
| | |
The applicant shall fully implement Appendix C: Steele Mitigation and Monitoring Plan included (page 55) in the submitted Habitat Assessment dated February 10, 2019 and call for an inspection once completed. Five years of monitoring and reporting (page 57 Habitat Assessment) will be required, with annual reports submitted to the County by November 30th of each year of monitoring.
|
|
|
Title:
|
| | |
GEOTECH
|
|
Wording
|
| | |
The applicant shall follow the recommendations of the Geotechnical Report, including the additional supports at the mid-span points of each of the stair runs (page 27 Steele Stair Project).
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
F-STAFF REPORT
|
|
Wording
|
| | |
See Staff Report dated June 1, 2020 for Findings and Conclusions.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(1)(b).
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the Shoreline Conditional Administrative use permit application on March 16, 2020 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated June 1, 2020 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-Approval for _____ Only
|
|
Wording
|
| | |
This approval is for a Shoreline Conditional Use permit for a Beach Access Structure only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|