Permit Case Summary

Case Number: Search Help

Case Number:SDP2019-00005 Case Status: Date Received:3/22/2019
Description:SHORELINE EXEMPTION TO REPAIR AND REPLACE EXISTING DOCK, DECK PLANKS, STRINGERS, BULL RAILS, PILINGS AND HARDWARE. ONGOING MAINTENANCE FOR 5-YEAR PERIOD Date Issued:5/21/2019
Applicant: PORT TOWNSEND PAPER CORP Expiration Date:5/21/2024 12:00:00 AM
Site Address:100 MILL RD Case Finaled:
Parcel No:001152006 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: File Archived
Date Completed: 11/12/2019
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 5/21/2019
Disposition: DONE
Description: A Clock Interrupt
Date Completed: 5/21/2019
Disposition: DONE
Description: Incomplete App Request Info
Date Completed: 5/21/2019
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 4/23/2019
Disposition:
Description: Consistency Review-U
Date Completed: 5/21/2019
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 5/21/2019
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 5/21/2019
Disposition: DONE
Description: Case Entered
Date Completed: 3/22/2019
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Exempt Maintenance Condition
Wording The development shall be essentially the same as the original in location, size, configuration, and external appearance.

Title: DEBRIS
Wording The applicant shall insure that debris does not fall into the marine water. Should debris enter the water it shall be removed immediately.

Title: DURATION & EXPIRATION
Wording The use or activity shall be commenced within two years of the effective date of the permit or permit exemption. Authorization to conduct development activities shall terminate five years after the effective date of a permit exemption. On-going maintence of the of the subject docks may be conducted without an additional exemption within the five year period so long as the work is consistent with the scope and activities described and approved under this exemption.

Title: BUILDING & FLOOD PERMIT
Wording The proposal requires a Building Permit and Flood Development Permit consistent with BLD14-00378.

Title: Hydraulic Code/HPA Check
Wording Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-EXEMPTION
Wording The proposal is consistent with, and approved under JCC 18.25.560(2) Maintenance and Repair as described in the PTPC Dock Maintenance Summary dated March 18, 2019.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3).

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline Exemption application on March 18, 2019 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated May 21, 2019 shall be resubmitted for review and approval by Jefferson County Department of Community Development.