Permit Case Summary

Case Number: Search Help

Case Number:SDP2017-00020 Case Status: Date Received:12/29/2017
Description:Shoreline Conditional Use (Administrative) Permit, Shoreline Substantial Development Permit Exemption and Flood Development Permit for a private mooring buoy in Mystery Bay, located off of Marrowstone Island (48.0580 N lat. / -122.6977 W long). The mooring buoy is proposed by installation of a helix anchor system with a midline float shackled to six feet of galvanized chain through an 18 inch float in water approximately 25 feet in depth at extreme high tide. The proposal is located on aquatic lands owned by the Washington State Department of Natural Resources. Date Issued:11/29/2018
Applicant:JON PISKULA Expiration Date:11/29/2023 12:00:00 AM
Site Address:1 Case Finaled:
Parcel No:000000001 Other Cases Parcel Data Map It Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: File Archived
Date Completed: 11/7/2019
Disposition: DONE
Description: Issue CUP/Variance Permit
Date Completed: 11/29/2018
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 11/8/2018
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 10/31/2018
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 6/20/2018
Disposition: DONE
Description: DRD Reviewer Letter (F)
Date Completed: 6/19/2018
Disposition: DONE
Description: Ntc of App +30-Publish-UF
Date Completed: 6/12/2018
Disposition: DONE
Description: Ntc of App +30-APO-UF
Date Completed: 6/12/2018
Disposition: DONE
Description: A Clock Interrupt
Date Completed: 6/11/2018
Disposition: DONE
Description: Additional Info Request-DRD
Date Completed: 6/11/2018
Disposition: DONE
Description: Consistency Review-U
Date Completed: 10/31/2018
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 10/31/2018
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 10/31/2018
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 6/8/2018
Disposition:
Description: Case Entered
Date Completed: 12/29/2017
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Vessel maintenance activities
Wording Vessel maintenance activities which may cause water pollution, including hull chipping and painting, shall be performed at designated facilities.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the SMP other than as described above shall receive separate review from this Department.

Title: Site Plan
Wording Construction shall be in substantial compliance with the site plan submitted on December 28, 2017 as it exists now or is hereafter amended by Jefferson County and/or Ecology.

Title: Progress towards completion
Wording Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: BIOP CONDITION
Wording To show compliance with the Federal Emergency Management Agency's Biological Opinion, the applicant shall adhere to all permit conditions in the permit issued by the U.S. Army Corps of Engineers.

Title: SHORELINE CUP CONDITION
Wording This is a conditional use approval issued by Jefferson County. The final permitting decision will be made by Washington State Department of Ecology (Ecology). The applicant shall not begin any work approved under this conditional use permit until written authorization to proceed has been obtained from Ecology. The findings for the following conditions are included in the staff report finalized in November 2018.

Title: LABEL CONDITION
Wording The mooring buoy shall be clearly marked with the owner's name, owner's contact information, and applicable permit number(s).

Title: CAPACITY CONDITION
Wording The capacity of each mooring buoy may not exceed one boat and its appurtenant shore access craft.

Title: LIVEABORD CONDITION
Wording The mooring buoy shall not be used for residential purposes.

Title: OTHER REGS CONDITION
Wording Nothing in this permit shall excuse the permittee from complying with applicable local, state, or federal statues,ordinances, or regulations.

Title: Follow Flood Ordinance
Wording Flood hazard reduction measures are to be used as required by Jefferson County Code Chapter 15.15.

Title: Res Construction Flood Damage
Wording The approved project shall adhere to the following construction materials and methods of construction to reduce flood hazard: (i) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage; and (ii) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage.