Permit Case Summary

Case Number: Search Help

Case Number:SDP2017-00003 Case Status:Withdrawn Date Received:3/8/2017
Description:The proposal is for a Shoreline Substantial Development Permit for 10 acres of suspended tumble oyster aquaculture, adjacent to 55 acres of existing and on-going bottom oyster and manila clam aquaculture. The Jamestown S’Klallam Tribe and Port Gamble S’Klallam Tribe are proposing to produce shellfish (oyster and manila clam) for human consumption. The proposal is located on Washington State Department of Natural Resources tidelands along the northeast shoreline of Dabob Bay. The leased tidelands are a total of 67.76 in size. These tidelands have been used for aquaculture cultivation previously and 55 acres of the proposal is considered to be an existing and on going use and is therefore not subject to a Shoreline Substantial Development Permit. The proposed existing and on going use methods include On Bottom Beach Oysters, On Bottom Flip Bags, and Manila Clam farming methods of seeding substrate and covering with predator netting. Ten acres of new Suspended Tumbled Oyster Culture is proposed. The Suspended Tumble Oyster Culture method consists of structures subject to a Shoreline Substantial Development Permit. No development is proposed landward of ordinary high water mark. All access is proposed by boat using the Quilcene Marina boat launch and the Point Whitney boat launch (WDFW). A No Net Loss biological report to address impacts to the shoreline functions and processes was submitted. A Visual Analysis Report of the aesthetic effects of the tumble bags was submitted. An Archeological Survey of the project area has been completed. A Flood Development Permit will also be issued by the Jefferson County Department of Community Development. A US Army Corps of Engineers Nation Wide 48 Permit has been issued. A lease with the Washington State Department of Natural Resources is under negotiation. The proposal is subject to review under the State Environmental Policy Act. Date Issued:
Applicant: JAMESTOWN S'KLALLAM TRIBE Expiration Date:
Site Address:1 Case Finaled:
Parcel No:000000001 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: WITHDRAW APP
Date Completed:
Disposition:
Description: Updated/Add'l Info Recv'd
Date Completed: 5/25/2017
Disposition: DONE
Description: DRD Reviewer Letter (F)
Date Completed: 5/23/2017
Disposition:
Description: DRD Reviewer Letter (F)
Date Completed: 5/23/2017
Disposition:
Description: Ntc of App +30-Publish-UF
Date Completed: 5/18/2017
Disposition: DONE
Description: Ntc of App +30-APO-UF
Date Completed: 5/18/2017
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 5/18/2017
Disposition: DONE
Description: Updated/Add'l Info Recv'd
Date Completed: 5/4/2017
Disposition: 4/28
Description: Invoice for DCD Sent
Date Completed: 4/3/2017
Disposition:
Description: A Clock Interrupt
Date Completed: 5/18/2017
Disposition: DONE
Description: Incomplete App Request Info
Date Completed: 5/11/2017
Disposition: DONE
Description: RAP Review Complete-U
Date Completed:
Disposition:
Description: Consistency Review-U
Date Completed:
Disposition:
Description: Env. Sensitive Area Review-U
Date Completed:
Disposition:
Description: Stormwater Review-U
Date Completed:
Disposition:
Description: App Substantially Complete-U
Date Completed: 5/11/2017
Disposition: DONE
Description: Septic Review Complete-U
Date Completed:
Disposition:
Description: Case Entered
Date Completed: 3/8/2017
Disposition: