Description:
|
| | |
Status updtd - Energov Convrsn
|
|
Date Completed:
|
| | |
10/4/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
8/6/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve Exemption-UF
|
|
Date Completed:
|
| | |
1/7/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Reviewer Letter (F)
|
|
Date Completed:
|
| | |
12/29/2015
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
12/23/2015
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
1/7/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
12/23/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
12/23/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
12/23/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
12/22/2015
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
CONSTRUCTION MATERIALS
|
|
Wording
|
| | |
Construction Materials and Methods: (1) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage; and (2) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage.
|
|
|
Title:
|
| | |
ADJACENT FOREST LANDS DISCLOSURE
|
|
Wording
|
| | |
Jefferson County has determined that the use of real property for agriculture and forestry operations is a high priority and favored use in the county. The county will not consider to be a nuisance those inconveniences or discomforts arising from such operations, if such operations are consistent with commonly accepted best management practices in compliance with local, state, and federal laws. If your real property includes or is within five hundred (500) feet of real property designated as Rural Residential 1:10 or 1:20, Rural Industrial, Rural Commercial, Agriculture, or Forestry, you may be subject to inconveniences or discomforts arising from such farming and forestry operations, including but not limited to noise, tree removal, odors, flies, fumes, dust, smoke, the operation of farm and forestry machinery during any 24-hour period, the storage and disposal or manure, and the application of permitted fertilizers and permitted pesticides. One or more of these inconveniences may occur as a result of agricultural and forestry operations which are in conformance with existing laws and regulations.
|
|
|
Title:
|
| | |
TRANSPORTATION MATERIALS
|
|
Wording
|
| | |
Per JCC 18.25.520(4)(i): Transportation facilities shall be constructed of materials that will not adversely affect water quality or aquatic plants and animals over the long term. Elements within or over water shall be constructed of materials approved by applicable state agencies for use in water for both submerged portions and other components to avoid discharge of pollutants from splash, rain or runoff. Wood or pilings treated with creosote, pentachlorophenol or other similarly toxic materials are prohibited. Preferred materials are concrete and steel.
|
|
|
Title:
|
| | |
EXISTING ROAD REPAIR
|
|
Wording
|
| | |
Per JCC 18.25.520 (1)(b): Maintenance and repair of existing roads in shoreline jurisdiction shall use all reasonable methods to minimize adverse impacts on nearby shorelines.
|
|
|
Title:
|
| | |
WATER QUALITY
|
|
Wording
|
| | |
Per JCC 18.25.520(4)(i):Transportation facilities shall be constructed of materials that will not adversely affect water quality or aquatic plants and animals over the long term. Elements within or over water shall be constructed of materials approved by applicable state agencies for use in water for both submerged portions and other components to avoid discharge of pollutants from splash, rain or runoff. Wood or pilings treated with creosote, pentachlorophenol or other similarly toxic materials are prohibited. Preferred materials are concrete and steel.
|
|
|
Title:
|
| | |
IMPROVE WATER QUALITY
|
|
Wording
|
| | |
Per JCC 18.25.520(4)(j) Transportation development shall be carried out in a manner that maintains or improves state water quality standards for affected waters.
|
|
|
Title:
|
| | |
OPTIMAL SEASON
|
|
Wording
|
| | |
Per JCC 18.25.520(4)(l) Non-emergency construction and repair work shall be scheduled for that time of year when seasonal conditions (weather, streamflow) permit optimum feasible protection of shoreline ecological functions and processes.
|
|
|
Title:
|
| | |
Follow Flood Ordinance
|
|
Wording
|
| | |
Flood hazard reduction measures are to be used as required by the Jefferson County Flood Damage Prevention Ordinance 07-0515-06 (Jefferson County Code Chapter 15.15).
|
|
|
Title:
|
| | |
BMPs
|
|
Wording
|
| | |
The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.
|
|
|
Title:
|
| | |
Hydraulic Code/HPA Check
|
|
Wording
|
| | |
Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.
|
|
|
Title:
|
| | |
Comply with HPA
|
|
Wording
|
| | |
In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.
|
|
|
Title:
|
| | |
Army Corps Check
|
|
Wording
|
| | |
Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.
|
|
|
Title:
|
| | |
F-SDP EXEMPTION SECTION
|
|
Wording
|
| | |
The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section JCC 18.25.560(2) and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.
|
|
|
Title:
|
| | |
F-FEMA BI-OP EXEMPT
|
|
Wording
|
| | |
The proposed road repair is located in Western Jefferson County and is not subject to the FEMA Biological Opinion; however, a portion of the proposed road repair is located within a special flood hazard area and therefore shall comply with Chapter 18.22 JCC.
|
|
|
Title:
|
| | |
F-CRITICAL AREAS EXEMPTION
|
|
Wording
|
| | |
A portion of the road repair project is located outside of shoreline jurisdiction and it meets the critical areas maintenance and repair exemption in JCC 18.22.070(3).
|
|
|
Title:
|
| | |
F-FLOOD DEVELOPMENT PERMIT
|
|
Wording
|
| | |
The proposal will be located in Kalaloch Creek in an area that is mapped on the Federal Emergency Management Agency Flood Insurance Rate Map (panel 530069 1350B) as Zone A. The proposed project is subject to the requirement for a flood development permit, which is incorporated into this decision. The proposal meets the definition of development but not structure in the flood damage prevention ordinance, as codified in JCC 15.15.050.
|
|
|
Title:
|
| | |
F-NO INCREASE IN FLOOD LEVELS
|
|
Wording
|
| | |
The proposed project will not result in any increase in flood levels during the occurrence of base flood discharges.
|
|
|
Title:
|
| | |
F-Confirmed ESAs
|
|
Wording
|
| | |
The application was reviewed by the Jefferson County Department of Community Development staff on December 23, 2015 for the potential presence of Critical Areas under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following critical areas were confirmed to be present on the subject property: fish and non-fish bearing streams, Northern spotted owl and marbled murrelet Fish and Wildlife Habitat Conservation Areas, wetlands, rare plants, Special Flood Hazard Area Zone A, critical aquifer recharge area: unknown susceptibility.
|
|
|
Title:
|
| | |
F-SEPA Exempt
|
|
Wording
|
| | |
Reviewed under the State Environmental Policy Act (SEPA) by Washington Department of Transportation (WSDOT) acting as lead agency. WSDOT determined the project is categorically exempt under WAC 468-12-800 (1)(u).
|
|
|
Title:
|
| | |
F-Site Plan Changes
|
|
Wording
|
| | |
The site plan as submitted with the Bituminus Surface Treatment road repair application on December 21, 2015 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated December 23, 2015 shall be resubmitted for review and approval by Jefferson County Department of Community Development.
|
|
|
Title:
|
| | |
F-APPROVAL FOR ROAD REPAIR ONLY
|
|
Wording
|
| | |
This approval is for a Hwy 101 Bituminus Surface Treatment repair only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
F-General PMT Notice
|
|
Wording
|
| | |
NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development, but consistent with RCW 90.58.
Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Shoreline Management Master Program and the Jefferson County Unified Development Code.
If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once.
The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that "takes" listed species (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. Portions of Jefferson County, including marine environments are included as "critical habitat" for listed species. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following:
- All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters
- Remove minimal vegetation for site development, especially large trees
- Allow trees that have fallen into surface waters to remain there
- Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into surface waters or roadside ditches
The Federal Bald and Golden Eagle Protection Act requires landowners within 660 feet (1/8th of a mile) of an eagle nest to consult with the US Fish and Wildlife Service. This Eagle Act prohibits anyone from "taking" bald eagles. This federal law defines the term "take" and describes the possible legal consequences when a "take" occurs. Among other actions, "take" includes a disturbance of bald eagles or their habitat. Under federal law a permit may still be required for activities that impact bald eagles or their habitat. Contact the US Fish and Wildlife Service (http://www.fws.gov/pacific/eagle/) to learn more about how this law affects your project.
Any individual, group, or agency can bring suit for a listed species "taking", even if you are in compliance with Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle, or the U.S. Fish and Wildlife Service.
|
|