Permit Case Summary

Case Number: Search Help

Case Number:SDP2014-00008 Case Status: Date Received:4/23/2014
Description:Discovery Bay Olympia Oyster Habitat Enhancement – This project is part of the Washington State’s Department of Fish & Wildlife Olympia Oyster Restoration Plan (2012). The purpose of the project is to improve function and viability of the Discovery Bay Olympia Oyster population by increasing suitable substrate near the current extant population. The applicant, in consultation with State Fish & Wildlife and the Puget Sound Restoration Fund staff, is focusing on enhancing habitat structure, which will set the stage for this population to expand on its own. The project is designed to test two new strategies for enhancing native oyster habitat with minimal use of shell. No oyster harvesting will be part of the project. The project requires a Type I master shoreline program (JCC 18.27) review with a letter of Shoreline Exemption (#16) and SEPA environmental review with a threshold determination. Date Issued:6/12/2014
Applicant:CHERYL LOWE - JCMRC COORDINATOR Expiration Date:6/12/2015 12:00:00 AM
Site Address:282023 HWY 101 Case Finaled:
Parcel No:902242005 Other Cases Parcel Data Map It Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 6/12/2014
Disposition: DONE
Description: Ntc of App +14-Publish-U
Date Completed: 4/28/2014
Disposition: DONE
Description: Ntc of App +14-APO-U
Date Completed: 4/28/2014
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 4/28/2014
Disposition: DONE
Description: DCD Review Time
Date Completed: 4/25/2014
Disposition: PEND
Description: Consistency Review-U
Date Completed: 6/12/2014
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/12/2014
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 4/28/2014
Disposition: DONE
Description: Case Entered
Date Completed: 4/23/2014
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Hydraulic Code/HPA Check
Wording Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-RESTORATION PROJECT
Wording This project is part of the Washington State’s Department of Fish & Wildlife Olympia Oyster Restoration Plan (2012).

Title: F-DNS Issued
Wording Reviewed under the State Environmental Policy Act (SEPA) by Jefferson County acting as lead agency. Determination of Non-Significance (DNS) issued on June 12, 2014.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline Exemption application on April 23, 2014 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated June 12, 2014 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a Seeding Oyster in South Discovery Bay with Monitoring only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section JCC 18.25.560(16) and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.