Description:
|
| | |
Status updtd - Energov Convrsn
|
|
Date Completed:
|
| | |
10/4/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
8/6/2018
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Approve SDP Permit-UF
|
|
Date Completed:
|
| | |
6/4/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Hearing Date
|
|
Date Completed:
|
| | |
6/2/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Hearing Exam PH Notice-Pub-UF
|
|
Date Completed:
|
| | |
4/17/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Hearing Exam PH Notice-APO-UF
|
|
Date Completed:
|
| | |
4/17/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
4/1/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-DRD
|
|
Date Completed:
|
| | |
4/1/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
2/18/2015
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
9/29/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
3/12/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-DRD
|
|
Date Completed:
|
| | |
3/12/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
8/20/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
7/28/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
7/28/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DRD Reviewer Letter (F)
|
|
Date Completed:
|
| | |
7/7/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Ntc of App +30-Publish-UF
|
|
Date Completed:
|
| | |
7/3/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Ntc of App +30-APO-UF
|
|
Date Completed:
|
| | |
7/3/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
5/27/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
5/27/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
4/7/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
1/28/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
6/4/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
4/1/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
4/1/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
7/3/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Septic Review Complete-U
|
|
Date Completed:
|
| | |
2/24/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
1/21/2014
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
HEARING EXAMINER CONDITION
|
|
Wording
|
| | |
The proposal is subject to the following conditions:
1. Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.
2. The applicant shall adhere to all requirements of the Hydraulic Project Approval, if required by Washington Department of Fish and Wildlife.
3. The applicant shall construct the berm based on the Final Design Set drawings submitted to DCD on January 8, 2014.
4. The berm shall not exceed a maximum of four feet in height. If at any point along the berm, the height exceeds four feet the applicant shall apply for and receive a building permit.
5. Any damage to the proposed berm shall be repaired or removed as soon as practicable.
6. No fill or other materials may be placed in Discovery Bay.
7. Best Management Practices (BMPs) shall be implemented based on the submitted Construction Stormwater Pollution Prevention Plan prepared for this project, which includes but is not limited to: (1) project limits shall be marked on the site prior to beginning any work on this project; (2) soils shall not remain exposed or allowed to enter Discovery Bay; and (3) contractors shall have oil-absorbent materials onsite to prevent any inadvertent oils spill from entering the water.
|
|
|
Title:
|
| | |
FEMA BIOPCONDITION
|
|
Wording
|
| | |
The applicant shall implement the mitigation measures in the Habitat Assessment (dated December 16, 2013) to minimize and avoid impacts to federally-listed species.
|
|
|
Title:
|
| | |
Follow Flood Ordinance
|
|
Wording
|
| | |
Flood hazard reduction measures are to be used as required by the Jefferson County Flood Damage Prevention Ordinance 07-0515-06 (Jefferson County Code Chapter 15.15).
|
|
|
Title:
|
| | |
Res Construction Flood Damage
|
|
Wording
|
| | |
Construction Materials and Methods of Construction to Reduce Flood Hazard:
(i) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage; and
(ii) All new construction and substantial improvements shall be constructed using methods and practices that minimize flood damage.
|
|