Description:
|
| | |
Status updtd - Energov Convrsn
|
|
Date Completed:
|
| | |
10/4/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
2/22/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue CUP/Variance Permit
|
|
Date Completed:
|
| | |
3/28/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue CUP/Variance Permit
|
|
Date Completed:
|
| | |
3/21/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue CUP/Variance Permit
|
|
Date Completed:
|
| | |
3/21/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Hearing Examiner Decision
|
|
Date Completed:
|
| | |
3/21/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Hearing Date
|
|
Date Completed:
|
| | |
3/21/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
2/12/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Updated/Add'l Info Recv'd
|
|
Date Completed:
|
| | |
1/14/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Hearing Exam PH Notice-Pub-UF
|
|
Date Completed:
|
| | |
1/8/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Hearing Exam PH Notice-APO-UF
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Return Status to Pending "P"
|
|
Date Completed:
|
| | |
8/26/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Status to PIA Pending Inactive
|
|
Date Completed:
|
| | |
7/16/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
2/28/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
2/28/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
A Clock Interrupt
|
|
Date Completed:
|
| | |
9/10/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Info Request-DRD
|
|
Date Completed:
|
| | |
9/10/2015
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
1/27/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
1/27/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
1/27/2014
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
1/27/2014
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Ntc of App +30-Publish-UF
|
|
Date Completed:
|
| | |
1/16/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Ntc of App +30-Publish-UF
|
|
Date Completed:
|
| | |
1/16/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Ntc of App +30-APO-UF
|
|
Date Completed:
|
| | |
1/16/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DRD Reviewer Letter (F)
|
|
Date Completed:
|
| | |
1/16/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Det. of Completeness-UF
|
|
Date Completed:
|
| | |
1/16/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
12/11/2013
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
12/11/2013
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
11/15/2013
|
|
Disposition:
|
| | |
PEND
|
|
|
Description:
|
| | |
DCD Review Time
|
|
Date Completed:
|
| | |
11/15/2013
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
1/8/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
1/8/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
2/26/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
1/16/2014
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
11/14/2013
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
HEARING EXAMINER CONDITION
|
|
Wording
|
| | |
The applicant shall adhere to all conditions in the Hearing Examiner Decision (dated February 10, 2016):
1. Prior to constructing the trail, the applicant shall obtain a building permit from Jefferson County Department of Community Development. Stamped, engineered drawings shall be included in the building application submittal.
2. At the time of building application, the applicant shall submit plan sheets for the trail signs that comply with the sign code in place at the time of building application.
3. Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.
4. The applicant shall adhere to all Hydraulic Project Approval requirements.
5. Prior to issuance of a building permit for the proposal, the applicant shall contact Margie Bigelow with Washington Department of Fish and Wildlife to ensure compliance with HPA requirements.
6. The applicant shall obtain a permit from the U.S. Army Corps of Engineers prior to beginning any work on this project to show compliance with federal permitting requirements, including the FEMA BiOp.
7. Any damage to proposed structures shall be repaired or removed as soon as practicable. At the end of the useful life of any structures, they will be removed as soon as practicable.
8. The applicant shall adhere to all conclusions and recommendations presented in the geotechnical report prepared by GeoEngineers (dated December 16, 2013).
9. The applicant shall implement the proposed mitigation described in the November 29, 2015 Addendum to Critical Areas Report and the landscaping sheets L1 through L12 submitted on August 13, 2015 letter (entitled Additional SEPA Items EXCEPT that varieties of native species, such as Blizzard Mock Orange (Philadelphus Lewsii ‘Blizzard’) and amethyst coralberry (Symphoricarpos x Doorenbosii ‘Kordes’) shall not be planted within any fish and wildlife habitat conservation area, wetland, or critical area buffer. No landscaping varieties or non-native plant species shall be installed within a critical area or buffer. Prior to building final, DCD shall verify that only native species have been installed within the critical areas, buffers, and mitigation area, as per the approved mitigation proposal and this permit condition.
10. The applicant shall implement the stormwater control plan in the Stormwater Site Plan Report prepared for this project by Nakano Associates (dated December 13, 2013) and shall ensure all applicable BMPs are in place to protect water quality.
11. The applicant shall comply with any applicable requirements in the U.S. Coast Guard Private Aids to Navigation.
12. The trail shall be used for day recreational uses only; overnight recreational uses are prohibited.
13. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff form carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants.
14. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action.
15. A stormwater permit (National Pollutant Discharge Elimination System and a State Waste Discharge General Permit for Stormwater Discharges Associated with Construction) is required if both of the following are met:
a. One or more acres of soil surface area will be disturbed by construction activities.
b. The site already has offsite discharge to waters of the state or stormdrains or will have offsite discharge during construction.
16. The applicant shall adhere to the protocols in the March 20, 2013 letter from the Suquamish Tribe if any inadvertent archaeological resource or humban remains are found.
|
|
|
Title:
|
| | |
F-STAFF REPORT FINDING
|
|
Wording
|
| | |
The findings for this shoreline permit are presented in the staff report prepared for the hearing examiner (dated January 19, 2016).
|
|
|
Title:
|
| | |
F-General PMT Notice
|
|
Wording
|
| | |
NOTICE: This permit does not excuse the proponent from complying with other local, state, and federal ordinances, regulations, or statutes applicable to the proposed development, but consistent with RCW 90.58.
Development pursuant to this permit shall be undertaken subject to the applicable policies and performance standards of the Jefferson County Shoreline Management Master Program and the Jefferson County Unified Development Code.
If during excavation or development of the site an area of potential archaeological significance is uncovered, all activity in the immediate area shall be halted, and the Administrator shall be notified at once.
The Federal Endangered Species Act rules to protect threatened Chinook and Summer-run Chum salmon became effective on January 8, 2001. Bull trout have been listed as threatened since early 2000. Under the ESA, any person may bring lawsuit against any individual or agency that "takes" listed species (defined as causing harm, harassing, or damaging habitat for the listed species). In addition, the National Marine Fisheries Service can levy penalties. Portions of Jefferson County, including marine environments are included as "critical habitat" for listed species. Development of property along any marine shoreline, freshwater shoreline, or floodplains could harm habitat if protective measures are not taken. To minimize the potential to damage habitat, all property owners developing adjacent to marine shoreline, freshwater shoreline, or floodplains are advised to do the following:
- All development activities should avoid unstable slopes, wetlands, and forested areas near surface waters
- Remove minimal vegetation for site development, especially large trees
- Allow trees that have fallen into surface waters to remain there
- Infiltrate stormwater from buildings and driveways onsite through drywells rather than discharging directly into surface waters or roadside ditches
The Federal Bald and Golden Eagle Protection Act requires landowners within 660 feet (1/8th of a mile) of an eagle nest to consult with the US Fish and Wildlife Service. This Eagle Act prohibits anyone from "taking" bald eagles. This federal law defines the term "take" and describes the possible legal consequences when a "take" occurs. Among other actions, "take" includes a disturbance of bald eagles or their habitat. Under federal law a permit may still be required for activities that impact bald eagles or their habitat. Contact the US Fish and Wildlife Service (http://www.fws.gov/pacific/eagle/) to learn more about how this law affects your project.
Any individual, group, or agency can bring suit for a listed species "taking", even if you are in compliance with Jefferson County development codes. The risk of a lawsuit against you can be reduced by consulting with a professional fisheries habitat biologist, and following the recommendations for site development provided by the biologist. For more information, contact the National Marine Fisheries Service in Seattle, or the U.S. Fish and Wildlife Service.
|
|