Permit Case Summary

Case Number: Search Help

Case Number:SDP2008-00032 Case Status: Date Received:5/20/2008
Description:Mooring Buoy Replacement Project Date Issued:8/25/2008
Applicant: WATERWAYS Expiration Date:8/25/2009 12:00:00 AM
Site Address: Case Finaled:
Parcel No:000000000 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Status updtd - Energov Convrsn
Date Completed: 10/4/2022
Disposition: DONE
Description: File Archived
Date Completed: 4/4/2018
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 8/25/2008
Disposition: DONE
Description: Review Complete-U
Date Completed: 8/25/2008
Disposition: DONE
Description: Case Entered
Date Completed: 5/27/2008
Disposition:
Description: App Substantially Complete-U
Date Completed: 8/25/2008
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 8/25/2008
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/25/2008
Disposition: DONE
Description: Consistency Review-U
Date Completed: 8/25/2008
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Buoy Not Rented/Leased-Exemptions
Wording The mooring buoy shall not be rented or leased.

Title: Buoy: No More Than Two (2) Boats
Wording No more than two (2) boats shall be secured by a mooring buoy.

Title: Buoy marked
Wording The buoy shall be permanently marked with the proponent's name, address, and telephone number and the permit number.

Title: Buoy discernible from a distance
Wording The buoy shall be discernible from a minimum distance of 100 yards under normal daylight conditions.

Title: Discharge oil: state & fed regs
Wording The proponents shall comply with all relevant state and federal regulations pertaining to the discharge of oil.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Exempt Maintenance Condition
Wording The development shall be essentially the same as the original in location, size, configuration, and external appearance.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F- ARMY CORPS APPROVAL
Wording The US Army Corps of Engineers issued a letter dated December 28, 2007, Reference No: NWS-2007-1675-SO, approving the proposed project.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on August 25, 2008 for the potential presence of Environmentally Sensitive Areas (ESAs) under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Conservancy Shoreline Designation; Bald Eagle Habitat.

Title: F-HPA Issued
Wording The Washington Department of Fish and Wildlife issued Hydraulic Project Approval (HPA) for this activity on September 18, 2007 under Control Number 110669-1. The HPA expires on January 14, 2009.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3).

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline Exemption Permit application on May 20, 2008 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated August 25, 2008 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for (4) Mooring Buoy Replacements only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section JCC 18.25.090(6) and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.