Permit Case Summary

Case Number: Search Help

Case Number:SDP2006-00023 Case Status:Finaled Date Received:6/26/2006
Description:Streamlined Fish habitat enhancement project - remove a portion of a levee and install six engineered log jams Date Issued:6/30/2006
Applicant: STATE OF WASHINGTON-NAT RESOUR Expiration Date:6/30/2007 12:00:00 AM
Site Address:306992 HWY 101 Case Finaled:
Parcel No:502021001 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 11/30/2007
Disposition: DONE
Description: Close case
Date Completed: 11/30/2007
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 6/30/2006
Disposition: DONE
Description: Review Complete-U
Date Completed: 6/30/2006
Disposition: DONE
Description: Case Entered
Date Completed: 6/27/2006
Disposition:
Description: Septic Review Complete-U
Date Completed: 6/30/2006
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 6/30/2006
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 6/30/2006
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/30/2006
Disposition: DONE
Description: Consistency Review-U
Date Completed: 6/30/2006
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 6/30/2006
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Hydraulic Code/HPA Check
Wording Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-PROPOSAL
Wording The proposal is to enhance fish habitat by removing a portion of a levee and installing six engineered log jams in the lower Dosewallips river.

Title: F-REVIEW OF PROPOSAL
Wording RCW 77.55.290 (4) states that local government may not require permits or charge a fee for Fish Habitat Enhancement projects. This serves as Jefferson County's comments on the proposal and also provides a means for Jefferson County to track the proposed activity. Jefferson County has determined that Fish Habitat and Enhancement projects that conform to the provisions of the act are consistent with the Jefferson County Comprehensive Plan, Unified Development Code (UDC), and all other applicable ordinances and regulations. The State Legislature has determined that Fish Habitat and Enhancement projects that conform to the provisions of the act have been determined to be consistent with local shoreline master programs. The proposal has been submitted as a Fish Habitat and Enhancement project. If the WA State Department of Fish and Wildlife determines that the proposal does not qualify as a streamline Hydraulic Project Approval (HPA) by meeting the criteria of a Fish Habitat and Enhancement project (RCW 77.55.290), then a standard HPA will be required and permits may be required by Jefferson County. Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state. Provided that the proposal qualifies as Fish Habitat Enhancement project, this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to RCW 77.55.290 that states that Fish Habitat Enhancement projects are not subject to the requirements of RCW 43.21C.030(2)(c). If the proposal does not qualify as a Fish Habitat Enhancement project, the proposal may be subject to SEPA. The site plan and JARPA as submitted (SDP06-00023) on June 26, 2006 has been reviewed by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the approved site plan and JARPA dated June 30, 2006 shall be resubmitted for review by Jefferson County Department of Community Development.