Permit Case Summary

Case Number: Search Help

Case Number:SDP2004-00033 Case Status:Finaled Date Received:7/30/2004
Description:A Fish Habitat Enhancement Project of the removal of a dike from a 10 acre salt water marsh located within the boundaries of the Dosewallips State Park. The purpose of the proposal is to improve the function of the Dosewallips River by allowing the river to meander within the salt water marsh. Date Issued:8/11/2004
Applicant: WASHINGTON TROUT Expiration Date:8/4/2005 12:00:00 AM
Site Address: Case Finaled:
Parcel No:FRESH_SHOREOFSTATE Other Cases Parcel Data Map It Parcels Images

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 1/26/2006
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 8/11/2004
Disposition: DONE
Description: Close case
Date Completed: 8/4/2004
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 8/4/2004
Disposition: DONE
Description: Review Complete-U
Date Completed: 8/4/2004
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 8/4/2004
Disposition: DONE
Description: Application Received-UF
Date Completed: 7/30/2004
Disposition: DONE
Description: Case Entered
Date Completed: 7/30/2004
Disposition:
Description: Septic Review Complete-U
Date Completed: 8/4/2004
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 8/4/2004
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 8/4/2004
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/4/2004
Disposition: DONE
Description: Consistency Review-U
Date Completed: 8/4/2004
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 8/4/2004
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: BMPs
Wording The project shall adhere to the Best Management Practices (BMPs) to control stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems.

Title: Hydraulic Code/HPA Check
Wording Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-STREAMLINE PROJECT
Wording This proposal has qualified for the streamlined process for Fish Habitat and Enhancement (RCW 77.55.290) projects as indicated by a letter from the WA State Department of Fish and Wildlife dated June 17, 2004. The legislature has found that Fish Habitat and Enhancement projects to be consistent with the Shoreline Management Act. This project is sponsored by Washington Trout.

Title: F-Confirmed ESAs
Wording The application was reviewed by the Jefferson County Department of Community Development staff on August 4, 2004 for the potential presence of Environmentally Sensitive Areas under the provisions of the Unified Development Code (UDC). After an initial Geographic Information Systems mapping review and an investigative site inspection, the following ESAs were confirmed to be present on the subject property: Type 1 Shoreline (Natural), wetlands, wildlife (heritage & PHS), 100 year floodplain, seismic, aquifer recharge areas, SIPZ, and stormwater.

Title: F-HPA Issued
Wording The Washington Department of Fish and Wildlife has determined this proposal qualifies as a Fish Habitat Enhancement project (see letter dated June 17, 2004), and will issued a streamline Hydraulic Project Approval (HPA).

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to RCW 77.55.290 that states that Fish Habitat Enhancement projects are not subject to the requirements of RCW 43.21C.030(2)(c).

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline Exemption application (SDP 04-33) on July 30, 2004 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated August 4, 2004 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for activities associated with the removal of a dike a only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: F-DISPOSAL OF MATERIAL
Wording The approximate 500 cubic yards of excavated material should be disposed at an approved upland location outside of the shoreline jurisdiction and the 100 year floodplain.

Title: F-NATURE OF PROPOSAL
Wording RCW 77.55.290 (4) states that local government may not require permits or charge a fee for Fish Habitat Enhancement projects.