Permit Case Summary

Case Number: Search Help

Case Number:SDP2002-10024 Case Status:Finaled Date Received:5/6/2002
Description:Installation of a helix anchor mooring buoy to be located in Port Townsend Bay. The applicant has applied with the Department of Natural Resources to lease a mooring site. The site is located in South Port Townsend Bay. The proposal is exempt from the State Environmental Policy Act per WAC 197-11-800(25)(g). Date Issued:7/30/2002
Applicant:THOMAS YARBROUGH Expiration Date:7/30/2004 12:00:00 AM
Site Address: Case Finaled:
Parcel No:PORTTOWNSENDBAY Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Miscellaneous Action
Date Completed: 6/15/2010
Disposition: DONE
Description: File Archived
Date Completed: 12/6/2004
Disposition: DONE
Description: Close case
Date Completed: 9/30/2002
Disposition: DONE
Description: Return status to "P"
Date Completed: 7/30/2002
Disposition: DONE
Description: Approve SDP Permit-UF
Date Completed: 7/30/2002
Disposition: DONE
Description: Ntc of App +14-APO-U
Date Completed: 6/27/2002
Disposition: DONE
Description: Ntc of App +14-Publish-U
Date Completed: 6/27/2002
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 5/28/2002
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 6/26/2002
Disposition: DONE
Description: Case Entered
Date Completed: 5/6/2002
Disposition:
Description: Septic Review Complete-U
Date Completed: 6/26/2002
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 5/28/2002
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 6/26/2002
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 6/26/2002
Disposition: DONE
Description: Consistency Review-U
Date Completed: 6/26/2002
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 6/26/2002
Disposition: DONE
Description: Application Received-UF
Date Completed: 5/6/2002
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Buoy Not Rented/Leased-Exemptions
Wording The mooring buoy shall not be rented or leased.

Title: Buoy: No More Than Two (2) Boats
Wording No more than two (2) boats shall be secured by a mooring buoy.

Title: Buoy marked
Wording The buoy shall be permanently marked with the proponent's name, address, and telephone number and the permit number.

Title: Buoy Placement-SDP
Wording The buoy shall be placed a minimum of 100 feet from existing permitted or exempted adjacent mooring buoys, docks, and piers. The buoy shall be located at least 100 feet seaward of the minus 6 foot mean lower low water tidal elevation.

Title: Buoy Permission Only
Wording This permit constitutes permission to place a mooring buoy and ground tackle only. Permission to place floats is not authorized.

Title: Buoy discernible from a distance
Wording The buoy shall be discernible from a minimum distance of 100 yards under normal daylight conditions.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Three day limit occupied boats
Wording Boats that are occupied shall not be permitted to moor at private docks, piers, and floats longer than three (3) days unless pump-out facilities are available in the immediate vicinity.

Title: Treated Materials Must be Cured
Wording All lumber and other materials treated with preservative shall be sufficiently cured to minimize leaching into the water or shore bed, in accordance with the Best Management Practices approved by the Washington Department of Fish and Wildlife.

Title: Site Plan
Wording Construction shall be in substantial compliance with the site plan submitted on 5/6/02 as it exists now or is hereafter amended by Jefferson County and/or the Washington Department of Ecology.

Title: Progress towards completion
Wording Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: Hydraulic Code/HPA Check
Wording Prior to commencing development activity, proponent is responsible for informing the Washington Department of Fish and Wildlife (WDFW) in order for WDFW to determine whether this action is subject to the Washington State Hydraulic Code (Chapter 220-10 WAC). Hydraulic Project Approval (HPA) is required for all hydraulic projects, which are defined as construction or performance of other work that will use, divert, obstruct, or change the natural flow or bed of any of the salt or fresh waters of the state.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-HPA Issued
Wording The Washington Department of Fish and Wildlife issued Hydraulic Project Approval (HPA) for this activity on 7/28/02 under Log Number STE7897-01. The HPA expires on 1/2/03.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(25)(g).

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline application on 6/27/02 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 7/30/02 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Approval for _____ Only
Wording This approval is for a mooring buoy only. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.