Permit Case Summary

Case Number: Search Help

Case Number:SDP2002-00012 Case Status:Finaled Date Received:3/6/2002
Description:The purpose of this project is to repair and replace existing damaged bull rails, decking, decking stringers, and debris wall timbers of the existing dock structure. The bull rails are wooden rails that are fastened to the top of the dock surface for safety and also vessel tie up. The bull rails are installed above the high tide level. No parts of the bull rails are in contact with the water. Similarly, the decking and support stingers are inside of the main storage warehouse and no part is in contact with the water. Date Issued:4/26/2002
Applicant: PORT TOWNSEND PAPER CORP Expiration Date:4/26/2003 12:00:00 AM
Site Address:100 PAPER MILL HILL RD Case Finaled:
Parcel No:001152006 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 3/23/2004
Disposition: DONE
Description: Close case
Date Completed: 9/30/2002
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 4/26/2002
Disposition: DONE
Description: Review Complete-U
Date Completed: 4/26/2002
Disposition: DONE
Description: Approve Exemption-UF
Date Completed: 4/26/2002
Disposition: DONE
Description: Additional Info Request-U
Date Completed: 4/22/2002
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 3/22/2002
Disposition: DONE
Description: Case Entered
Date Completed: 3/6/2002
Disposition:
Description: Septic Review Complete-U
Date Completed: 4/26/2002
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 3/22/2002
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 4/26/2002
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 4/26/2002
Disposition: DONE
Description: Consistency Review-U
Date Completed: 4/26/2002
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 4/26/2002
Disposition: DONE
Description: Application Received-UF
Date Completed: 3/6/2002
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: Min Use of Hazardous Materials
Wording The design, location, and construction of docks, piers, and floats, as well as their subsequent use, shall avoid adverse effects on fish, shellfish, wildlife, marine vegetation, water quality, and geohydraulic processes. Construction methods shall minimize the use of materials hazardous to the environment.

Title: Treated Materials Must be Cured
Wording All lumber and other materials treated with preservative shall be sufficiently cured to minimize leaching into the water or shore bed, in accordance with the Best Management Practices approved by the Washington Department of Fish and Wildlife.

Title: Minimize Hazards to Users
Wording Docks, piers, floats and boat houses shall be designed and constructed to minimize hazards to users and to be capable of withstanding the historic extremes of wind, wave, and tides at their location.

Title: Railings
Wording If provided, railings shall be of clear or open framework design and conform to the Uniform Building Code where required.

Title: Progress towards completion
Wording Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-HPA Issued
Wording The Washington Department of Fish and Wildlife issued Hydraulic Project Approval (HPA) for this activity on 3/7/02XXX under Log Number 00e2264.05. The HPA expires on 1/15/03.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-11-800(3). The scope of the project includes repair and maintenance to the existing dock.

Title: F-Site Plan Changes
Wording The site plan as submitted with the Shoreline application on 3/22/02 has been reviewed for consistency under the UDC, and has been approved by Jefferson County Department of Community Development. Any modifications, changes, and/or additions to the stamped, approved site plan dated 4/26/02 shall be resubmitted for review and approval by Jefferson County Department of Community Development.

Title: F-Custom Case Specific Finding
Wording A site visit was conducted with the Department of Fish and Wildlife on 4/22/02.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section 3.402.6 and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.