Case Number:SDP2001-00014 Case Status:Finaled Date Received:4/10/2001
Description:Shoreline Exemption for Emergency Repairs Date Issued:5/8/2001
Applicant: WA STATE PARKS & REC COMMISSION Expiration Date:5/8/2002 12:00:00 AM
Site Address:10541 FLAGLER RD Case Finaled:
Parcel No:021180000 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 12/13/2002
Disposition: DONE
Description: Close case
Date Completed: 9/30/2002
Disposition: DONE
Description: Print Dummy UDC Permit-UF
Date Completed: 5/8/2001
Disposition: DONE
Description: Issue Exemption
Date Completed: 5/8/2001
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 4/24/2001
Disposition: DONE
Description: Det. of Completeness-UF
Date Completed: 4/19/2001
Disposition: DONE
Description: Case Entered
Date Completed: 4/10/2001
Disposition:
Description: Septic Review Complete-U
Date Completed: 5/8/2001
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 4/19/2001
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 5/8/2001
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 5/8/2001
Disposition: DONE
Description: Consistency Review-U
Date Completed: 5/8/2001
Disposition: DONE
Description: RAP Review Complete-U
Date Completed: 5/8/2001
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Discharge oil: state & fed regs
Wording The proponents shall comply with all relevant state and federal regulations pertaining to the discharge of oil.

Title: Other Work/Separate Approval
Wording Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.

Title: No Fill or Other Material
Wording No fill or other material may be placed in the waters or intertidal areas of Jefferson County.

Title: Comply with HPA
Wording In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.

Title: Army Corps Check
Wording Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: F-Custom Universal Finding
Wording The project consists of two emergency repairs to an existing utility lines. One repair consists of the installation of approximately 250-feet of 4-inch pipe to replace the broken water lines. The other repair involved replacing 1,260-feet of oil line that sevices six buildings in Fort Flagler. The new line is type K soft copper with bras flair and pipe fittings. All control valving is brass. The old line was drained and left in the ground.

Title: F-SEPA Exempt
Wording Jefferson County determined that this proposal is categorically exempt from review under the State Environmental Policy Act (SEPA) pursuant to WAC 197-800-11(3). The project consists of repair to an exisiting utility.

Title: F-SDP Exemption Section
Wording The Development Review Division finds that this proposal is consistent with Shoreline Master Program Section 3.402(8) and is consequently exempt from the substantial development permit (SDP) requirements. Exemptions from the substantial development permit requirements do not exempt a proposed development from compliance with the applicable policies and standards of the Shoreline Master Program or other applicable Federal, State, or local permit or license requirements.