Description:
|
| | |
File Archived
|
|
Date Completed:
|
| | |
8/27/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Close case
|
|
Date Completed:
|
| | |
5/30/2003
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
TYPE A Appeal Instrctns (F)
|
|
Date Completed:
|
| | |
5/30/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Issue SDP Permit
|
|
Date Completed:
|
| | |
5/30/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Additional Information Request
|
|
Date Completed:
|
| | |
5/10/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Pub Date in Leader-Ntc of Appl
|
|
Date Completed:
|
| | |
10/18/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete (F)
|
|
Date Completed:
|
| | |
10/11/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
(F) SDP Application Notice +30
|
|
Date Completed:
|
| | |
10/11/2000
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
10/10/2000
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Shoreline Planner Review
|
|
Date Completed:
|
| | |
5/30/2001
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
Buoy: No More Than Two (2) Boats
|
|
Wording
|
| | |
No more than two (2) boats shall be secured by a mooring buoy.
|
|
|
Title:
|
| | |
Buoy marked
|
|
Wording
|
| | |
The buoy shall be permanently marked with the proponent's name, address, and telephone number and the permit number.
|
|
|
Title:
|
| | |
Buoy Placement-SDP
|
|
Wording
|
| | |
The buoy shall be placed a minimum of 100 feet from existing permitted or exempted adjacent mooring buoys, docks, and piers. The buoy shall be located at least 100 feet seaward of the minus 6 foot mean lower low water tidal elevation.
|
|
|
Title:
|
| | |
Vessel maintenance activities
|
|
Wording
|
| | |
Vessel maintenance activities which may cause water pollution, including hull chipping and painting, shall be performed at designated facilities.
|
|
|
Title:
|
| | |
Buoy Permission Only
|
|
Wording
|
| | |
This permit constitutes permission to place a mooring buoy and ground tackle only. Permission to place floats is not authorized.
|
|
|
Title:
|
| | |
Buoy discernible from a distance
|
|
Wording
|
| | |
The buoy shall be discernible from a minimum distance of 100 yards under normal daylight conditions.
|
|
|
Title:
|
| | |
Discharge oil: state & fed regs
|
|
Wording
|
| | |
The proponents shall comply with all relevant state and federal regulations pertaining to the discharge of oil.
|
|
|
Title:
|
| | |
Notification Prior to Beginning
|
|
Wording
|
| | |
The proponent shall notify the Jefferson County Department of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow monitoring and ensure compliance with permit conditions.
|
|
|
Title:
|
| | |
Other Work/Separate Approval
|
|
Wording
|
| | |
Work within the jurisdiction of the Shoreline Master Program other than as described above shall receive separate review from this Department.
|
|
|
Title:
|
| | |
Progress towards completion
|
|
Wording
|
| | |
Substantial progress towards completion of the project shall be performed within two years of the issuance of the permit.
|
|
|
Title:
|
| | |
Comply with HPA
|
|
Wording
|
| | |
In addition to Jefferson County permit conditions, the project proponent shall comply with all conditions set forth by the Washington Department of Fish and Wildlife through Hydraulic Project Approval.
|
|
|
Title:
|
| | |
Army Corps Check
|
|
Wording
|
| | |
Prior to commencing development activity, the proponent is responsible for informing the US Army Corps of Engineers (COE) in order for COE to determine whether a Department of the Army permit or review is required. Generally, review is required for construction and dredging in or around navigable waters of the US and for work or fill in hydrologically connected wetlands. Contact the US Army Corps of Engineers, Seattle District Regulatory Branch, PO Box 3755, Seattle WA 98124, (206) 764-3495, for more information.
|
|