Permit Case Summary

Case Number: Search Help

Case Number:SDP2000-10018 Case Status:Finaled Date Received:9/18/2000
Description:Installation of a mooring buoy utilizing a helix screw anchoring system with midline float for a 44 foot sailboat to be located in Mystery Bay. Date Issued:11/20/2000
Applicant:PETER KOPETZKY Expiration Date:11/20/2002 12:00:00 AM
Site Address: BLANK PARCEL FILE Case Finaled:
Parcel No:KILISUTHARBOR Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 8/27/2003
Disposition: DONE
Description: Close case
Date Completed: 11/20/2002
Disposition: DONE
Description: TYPE A Appeal Instrctns (F)
Date Completed: 11/20/2000
Disposition: DONE
Description: Issue SDP Permit
Date Completed: 11/20/2000
Disposition: DONE
Description: DRD Info Request
Date Completed: 11/8/2000
Disposition: DONE
Description: App Substantially Complete (F)
Date Completed: 9/21/2000
Disposition: DONE
Description: (F) SDP Application Notice +30
Date Completed: 11/17/2000
Disposition: DONE
Description: Pub Date in Leader-Ntc of Appl
Date Completed:
Disposition:
Description: Case Entered
Date Completed: 9/19/2000
Disposition:
Description: Shoreline Planner Review
Date Completed:
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: Buoy marked
Wording The buoy shall be permanently marked with the proponent's name, address, and telephone number and the permit number.

Title: Buoy placement
Wording The buoy shall be placed a minimum of 100 feet from existing permitted or exempted adjacent mooring buoys, docks, and piers. The buoy shall be located at least 100 feet seaward of the minus 6 foot mean lower low water tidal elevation.

Title: Vessel maintenance activities
Wording Vessel maintenance activities which may cause water pollution, including hull chipping and painting, shall be performed at designated facilities.

Title: Overnight use of buoy
Wording Overnight use by vessels with holding tanks shall be limited to three (3) consecutive days before the vessel must have its holding tanks pumped at an approved facility. Overnight use by vessels without holding tanks shall not be permitted. For the purposes of the permit, occupancy of a moored vessel for a period exceeding seven (7) days would constitute residential use and shall be prohibited.

Title: Buoy discernible from a distance
Wording The buoy shall be discernible from a minimum distance of 100 yards under normal daylight conditions.

Title: Discharge oil: state & fed regs
Wording The proponents shall comply with all relevant state and federal regulations pertaining to the discharge of oil.

Title: HPA ISSUED
Wording Hydraulic Project Approval (HPA) was issued by the Washington Department of Fish and Wildlife on October 31, 2000 under Log Number 00-E7815-01. The HPA expires on January 2, 2002.

Title: SEPA EXEMPT
Wording Recreational mooring buoys are exempt from review under the State Environmental Policy Act pursuant to WAC 197-11-800(25).

Title: NOTICE BEFORE WORK
Wording The proponent shall notify the Jefferson County Department of Community Development at (360) 379-4450 forty-eight (48) hours prior to commencing construction in order to allow monitoring and ensure conformance with permit conditions.

Title: SMP APPROVAL ONLY
Wording This approval pertains to Jefferson County Shoreline Management Master Program requirements only. The approval of any other agency with jurisdiction or any other required permits shall be obtained prior to undertaking the project.

Title: 2 BOATS
Wording No more than two (2) boats shall be secured by a mooring buoy.

Title: DNR
Wording The applicant is required to possess a valid mooring buoy license from the Washington Department of Natural Resources for placement of a mooring buoy on State Owned Aquatic Lands.

Title: CUSTOM CONDITION
Wording DUE TO CONTAMINATION CONCERNS, IT IS IMPERATIVE THAT NO HUMAN WASTE BE DISCHARGED INTO MYSTERY BAY. THE USE OF A PUMP-OUT FACILITY IS MANDATORY.

Title: Comply with HPA
Wording The proposal must comply with all applicable conditions as set forth in the Hydraulic Project Approval.

Title: ARMY CORPS. LANGUAGE
Wording The proponent is responsible for applying to the Corps of Engineers for a Department of the Army (DA) Permit. A DA permit shall be obtained prior to the performance of any activities waterward of the mean high water mark or ordinary high water mark or in wetlands. Please contact Mr. Jack Gossett or Ms. Susan Glenn at (206) 764-6902 or 6904, respectively for more information. Information can also be obtained from the U.S. Army Corps of Engineers, Regulatory Branch, Post Office Box 3755, Seattle, Washington 98124.