Description:
|
| | |
Status updtd - Energov Convrsn
|
|
Date Completed:
|
| | |
10/4/2022
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
TYPE B Appeal Instrctns (F)
|
|
Date Completed:
|
| | |
11/30/1999
|
|
Disposition:
|
| | |
A
|
|
|
Description:
|
| | |
Issue CUP/Variance Permit
|
|
Date Completed:
|
| | |
11/17/1999
|
|
Disposition:
|
| | |
A
|
|
|
Description:
|
| | |
(F) Hearing Examiner PH Notice
|
|
Date Completed:
|
| | |
11/2/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
(F) Issue Final MDNS +10
|
|
Date Completed:
|
| | |
8/29/1999
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
(F) SEPA Threshold (MDNS) +14
|
|
Date Completed:
|
| | |
8/18/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
App Substantially Complete (F)
|
|
Date Completed:
|
| | |
6/25/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
(F) SDP Application Notice +30
|
|
Date Completed:
|
| | |
7/30/1999
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
INCOMPLETE App REQ INFO (F)
|
|
Date Completed:
|
| | |
|
|
Disposition:
|
| | |
P
|
|
|
Description:
|
| | |
Shoreline Planner Review
|
|
Date Completed:
|
| | |
6/25/1999
|
|
Disposition:
|
| | |
P
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
A copy of the Hydraulic Project Approval (HPA) issued by the Department of Fish and Wildlife shall be submitted to the Department of Community Development prior to excavation. The applicant shall adhere to all conditions contained in the HPA.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The following Mitigative Measures contained in the Final Mitigated Determination of Non-Significance issued by Jefferson County on August 19, 1999 shall be met prior to the onset of excavation activities: * The proponent shall follow Best Management Practices in compliance with the Washington Department of Ecology's Stormwater Management Manual for the Puget Sound. * The proponent shall provide specific written information indicating the location where the excavated material will be placed. * Vegetation in the project area shall remain intact. No trees shall be removed or altered. Alteration or removal of existing ground cover shall be limited to that necessary to access the site.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Construction shall be in substantial with the site plan submitted to Jefferson County on May 21, 1999 as it exists now or is hereafter amended by Jefferson County and/or the Department of Ecology.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
No fill or other material may be placed in the waters or intertidal areas of Jefferson County.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Work within the jurisdiction of the Shoreline Program other than as described above shall recieve separate review from this office.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Prior to excavation, the proponent shall notify the Jefferson County Department of Community Development at (360) 379-4464 with estimated project timelines for monitoring and plan compliance.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Prior to the excavation of the gravel traps, the applicant shall provide the Department of Community Development with the name and address of the contractor carrying out the project.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Dredging shall cause no more than minimal disruption of natural geohydraulic process along shores and streams.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Dredging operations shall be scheduled so as not to materially interfere with the migratory movements of anadromous fish.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Dredging shall not cause unecessary interference with navigation or unecessary infringement upon adjacent shoreline uses, properties, or values.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Dredged material shall be deposited on upland sites whenever possible and only on those sites authorized by the substantial development permit.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Dredge materials deposited on upland sites shall constitute landfill and when deposited within the geographical jurisdiction of this Master program shall comply with the applicable performance standards.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Depositing of dredge materials in water areas shall be done in a manner that does not unnecessarily disrupt natural geohydraulic processes or interfere with the use or value of adjacent properties.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The applicant shall post signs providing reasonable notice that gravel trap excavation has occured and that those recreating in the area should exercise caution.
|
|