Description:
|
| | |
Issue Permit
|
|
Date Completed:
|
| | |
12/16/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
12/16/2019
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
12/16/2019
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue Permit
|
|
Date Completed:
|
| | |
11/21/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
11/21/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
11/21/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
11/21/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
11/15/2019
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
PERMIT ON SITE
|
|
Wording
|
| | |
This permit must be located on site when any work encompassed by the permit is being performed. Failure to do so may result in suspension of all work.
|
|
|
Title:
|
| | |
CULVERT 12"
|
|
Wording
|
| | |
A minimum 12 inch diameter culvert, not to exceed 40 feet in length, to accommodate 20 foot wide logging approaches with 25 foot approach radius are required at mile post 8.301 right and mile post 9.74 right. If more than one culvert is used, both culverts must be made of the same material and be connected with an approved band (see attached)
|
|
|
Title:
|
| | |
BEVELED
|
|
Wording
|
| | |
The ends of the culverts shall be bevel cut in accordance with the attached specifications.
|
|
|
Title:
|
| | |
SIGHT BRUSHING
|
|
Wording
|
| | |
The Applicant has permission to remove the trees within the right-of-way, adjacent to their parcel. All work shall be done from within the parcel and back side of the right of way. The applicant shall be responsible for maintaining all vegetation (removing timber within the right-of-way) to provide for the adequate sight distance adjacent to these road approaches.
|
|
|
Title:
|
| | |
RESPONSIBLE
|
|
Wording
|
| | |
The applicant shall be responsible for the cost to repair any and all damage to the county roadway and rights-of-way, including the integrity of all survey monuments or boundary markers.
|
|
|
Title:
|
| | |
CONSTR APPROACH
|
|
Wording
|
| | |
The applicant shall be responsible for maintaining a stabilized construction entrance, which shall be constructed as follows: 4 inch to 8 inch quarry spalls a minimum of 12 inches deep, a minimum width of 20 feet, a minimum radius of 25 feet, and a minimum length of 100 feet from the county road. The applicant shall also be responsible for immediately removing any material spilled or tracked onto the county road.
|
|
|
Title:
|
| | |
SURFACE WATER
|
|
Wording
|
| | |
The grade of each approach shall follow the crown of the road to the ditch, and be such that all surface water shall be directed into a ditch line and not onto the county road. The driveway shall be graded so rock does not spill out onto the roadway and shall begin at the back of ditch, or if there is no ditch, the back of the shoulder.
|
|
|
Title:
|
| | |
SIGNS
|
|
Wording
|
| | |
Signs indicating logging activity/trucks entering the roadway must be posted at each location on each side of the approach.
|
|
|
Title:
|
| | |
TEMPORARY
|
|
Wording
|
| | |
All temporary approaches must be removed and the right-of-way restored to its pre-existing condition upon completion of logging activities.
|
|
|
Title:
|
| | |
RAP ONLY
|
|
Wording
|
| | |
This approval is for the logging approaches only and does not constitute approval of other activities within the right of way or on this parcel. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
PRE-CON
|
|
Wording
|
| | |
Applicant must give Jefferson County Public Works office (360-385-9159) a minimum of 7 working days notice prior to beginning work. An on-site pre-construction conference shall be scheduled by the applicant and will include Public Works and the contractor who will be performing the work. Prior to this meeting, any utility locate marks shall be done (Call 811-48 hours before you dig).
|
|
|
Title:
|
| | |
FINAL INSPECTION
|
|
Wording
|
| | |
The Applicant must contact the Public Works Department for a final inspection upon completionof all conditions of this permit.
|
|