Permit Case Summary

Case Number: Search Help

Case Number:RAP2016-00006 Case Status:Approved Date Received:2/19/2016
Description:Temporary Logging Approach - Eaglemount Rd Date Issued:3/3/2016
Applicant: POPE RESOURCES Expiration Date:3/3/2017 12:00:00 AM
Site Address:OLD EAGLEMOUNT RD Case Finaled:
Parcel No:901302001 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Issue Permit
Date Completed: 3/3/2016
Disposition: DONE
Description: Override - Parcel Holds
Date Completed: 3/3/2016
Disposition:
Description: Override - Parcel Holds
Date Completed: 3/3/2016
Disposition:
Description: Override - Parcel Holds
Date Completed: 3/3/2016
Disposition:
Description: Override - Parcel Holds
Date Completed: 3/3/2016
Disposition:
Description: Issue Permit
Date Completed: 2/23/2016
Disposition: DONE
Description: Override - Parcel Holds
Date Completed: 2/23/2016
Disposition:
Description: Override - Parcel Holds
Date Completed: 2/23/2016
Disposition:
Description: Override - Parcel Holds
Date Completed: 2/23/2016
Disposition:
Description: Override - Parcel Holds
Date Completed: 2/23/2016
Disposition:
Description: Env. Sensitive Area Review-U
Date Completed: 2/19/2016
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 2/19/2016
Disposition: DONE
Description: App Substantially Complete-U
Date Completed: 2/19/2016
Disposition: DONE
Description: Case Entered
Date Completed: 2/19/2016
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: PERMIT ON SITE
Wording This permit must be located on site when any work encompassed by the permit is being performed. Failure to do so may result in suspension of all work.

Title: RESPONSIBLE
Wording The applicant shall be responsible for the cost to repair any and all damage to the county roadway and rights-of-way, including the integrity of all survey monuments or boundary markers.

Title: NO CULVERT
Wording An approach culvert is not necessary at this location at this time.

Title: CONSTR APPROACH
Wording The applicant shall be responsible for maintaining a stabilized construction entrance, which shall be constructed as follows: 4 inch to 8 inch quarry spalls a minimum of 12 inches deep, a minimum width of 20 feet, a minimum radius of 25 feet, and a minimum length of 100 feet from the county road. The applicant shall also be responsible for immediately removing any material spilled or tracked onto the county road.

Title: WORKER/ROW
Wording Any time that workers are on the county right-of-way warning signs shall be posted that workers are present. All workers shall comply with applicable Labor and Industries Guidelines for clothing including reflective vests. Any time that equipment must enter onto the right-of-way, signing and flaggers shall be used in accordance with applicable MUTCD standards.

Title: SURFACE WATER
Wording The grade of the approach shall follow the crown of the back of the shoulder, and be such that no surface water is directed onto the county road. The driveway shall be graded so rock does not spill out onto the roadway.

Title: CUSTOM CONDITION
Wording The Applicant shall maintain, repair and restore the shoulder area, should any damage occur, with a minimum of 2" compacted crushed granite gravel meeting WSDOT Standard Spec 9-03.9(3).

Title: RAP ONLY
Wording This approval is for a road approach and pull off area along Eaglemount Rd. only and does not constitute approval of other activities within the right of way or on this parcel. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.

Title: PRE-CON
Wording Applicant must give Jefferson County Public Works office (360-385-9159) a minimum of 7 working days notice prior to beginning work. An on-site pre-construction conference shall be scheduled by the applicant and will include Public Works and the contractor who will be performing the work. Prior to this meeting, any utility locate marks shall be done (Call 811-48 hours before you dig).

Title: FINAL INSPECTION
Wording The Applicant must contact the Public Works Department for a final inspection prior to a final building inspection.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: P-LOGGING APPROACH
Wording The applicant may construct a temporary approach for logging operations on Eaglemount Rd. at mile post 0.611 left.

Title: P-CUSTOM PERMISSION
Wording The Applicant may utilize the right-of-way along Eaglemount Rd at mile post 0.713 left to load logging trucks and will be required to follow all traffic control regulations per the MUTCD.

Title: P-CUSTOM PERMISSION
Wording The Applicant has permission to remove trees by a licensed, bonded contractor, in the right-of-way along Eaglemount Rd. adjacent to their parcel.