|
Description:
|
| | |
Issue Permit
|
|
Date Completed:
|
| | |
3/3/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
3/3/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
3/3/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
3/3/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
3/3/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Issue Permit
|
|
Date Completed:
|
| | |
2/23/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
2/23/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
2/23/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
2/23/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Override - Parcel Holds
|
|
Date Completed:
|
| | |
2/23/2016
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
2/19/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
2/19/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
2/19/2016
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
2/19/2016
|
|
Disposition:
|
| | |
|
|
|
Title:
|
| | |
PERMIT ON SITE
|
|
Wording
|
| | |
This permit must be located on site when any work encompassed by the permit is being performed. Failure to do so may result in suspension of all work.
|
|
|
Title:
|
| | |
RESPONSIBLE
|
|
Wording
|
| | |
The applicant shall be responsible for the cost to repair any and all damage to the county roadway and rights-of-way, including the integrity of all survey monuments or boundary markers.
|
|
|
Title:
|
| | |
NO CULVERT
|
|
Wording
|
| | |
An approach culvert is not necessary at this location at this time.
|
|
|
Title:
|
| | |
CONSTR APPROACH
|
|
Wording
|
| | |
The applicant shall be responsible for maintaining a stabilized construction entrance, which shall be constructed as follows: 4 inch to 8 inch quarry spalls a minimum of 12 inches deep, a minimum width of 20 feet, a minimum radius of 25 feet, and a minimum length of 100 feet from the county road. The applicant shall also be responsible for immediately removing any material spilled or tracked onto the county road.
|
|
|
Title:
|
| | |
WORKER/ROW
|
|
Wording
|
| | |
Any time that workers are on the county right-of-way warning signs shall be posted that workers are present. All workers shall comply with applicable Labor and Industries Guidelines for clothing including reflective vests. Any time that equipment must enter onto the right-of-way, signing and flaggers shall be used in accordance with applicable MUTCD standards.
|
|
|
Title:
|
| | |
SURFACE WATER
|
|
Wording
|
| | |
The grade of the approach shall follow the crown of the back of the shoulder, and be such that no surface water is directed onto the county road. The driveway shall be graded so rock does not spill out onto the roadway.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The Applicant shall maintain, repair and restore the shoulder area, should any damage occur, with a minimum of 2" compacted crushed granite gravel meeting WSDOT Standard Spec 9-03.9(3).
|
|
|
Title:
|
| | |
RAP ONLY
|
|
Wording
|
| | |
This approval is for a road approach and pull off area along Eaglemount Rd. only and does not constitute approval of other activities within the right of way or on this parcel. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
PRE-CON
|
|
Wording
|
| | |
Applicant must give Jefferson County Public Works office (360-385-9159) a minimum of 7 working days notice prior to beginning work. An on-site pre-construction conference shall be scheduled by the applicant and will include Public Works and the contractor who will be performing the work. Prior to this meeting, any utility locate marks shall be done (Call 811-48 hours before you dig).
|
|
|
Title:
|
| | |
FINAL INSPECTION
|
|
Wording
|
| | |
The Applicant must contact the Public Works Department for a final inspection prior to a final building inspection.
|
|