Title:
|
| | |
PERMIT ON SITE
|
|
Wording
|
| | |
This permit must be located on site when any work encompassed by the permit is being performed. Failure to do so may result in suspension of all work.
|
|
|
Title:
|
| | |
CULVERT 12"
|
|
Wording
|
| | |
The existing concrete culvert for Road Approach #2 may need to be replaced if any segment has failed. All new concrete segment ends must be fitted to avoid seperation and possible failure.
|
|
|
Title:
|
| | |
SIGHT BRUSHING
|
|
Wording
|
| | |
The applicant shall be responsible for maintaining all vegetation to provide for the adequate sight distance adjacent to this road approach.
|
|
|
Title:
|
| | |
RESPONSIBLE
|
|
Wording
|
| | |
The applicant shall be responsible for the cost to repair any and all damage to the county roadway and rights-of-way, including the integrity of all survey monuments or boundary markers.
|
|
|
Title:
|
| | |
SURFACE WATER
|
|
Wording
|
| | |
The grade of the approach shall follow the crown of the road to the ditch, and be such that all surface water shall be directed into a ditch line and not onto the county road.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Each approach shall be installed as shown in the plans submitted with the permit application (see sheet C-1, C-2 & C-3), except it is recommended that the HMA be a minimum of 3".
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
Road Approach #1 shall be limited to one-way traffic entering the property and is intended for employee use only.
|
|
|
Title:
|
| | |
PRE-CON
|
|
Wording
|
| | |
Applicant must give Jefferson County Public Works office (360-385-9159) a minimum of 7 working days notice prior to beginning work. An on-site pre-construction conference shall be scheduled by the applicant and will include Public Works and the contractor who will be performing the work. Prior to this meeting, any utility locate marks shall be done (Call 811-48 hours before you dig).
|
|
|
Title:
|
| | |
FINAL INSPECTION
|
|
Wording
|
| | |
The Applicant must contact the Public Works Department for a final inspection upon completion of both approaches, and, prior to a final building inspection.
|
|