Title:
|
| | |
PERMIT ON SITE
|
|
Wording
|
| | |
This permit must be located on site when any work encompassed by the permit is being performed. Failure to do so may result in suspension of all work.
|
|
|
Title:
|
| | |
SIGHT BRUSHING
|
|
Wording
|
| | |
The applicant shall be responsible for maintaining all vegetation to provide for the adequate sight distance adjacent to this road approach.
|
|
|
Title:
|
| | |
RESPONSIBLE
|
|
Wording
|
| | |
The applicant shall be responsible for the cost to repair any and all damage to the county roadway and rights-of-way, including the integrity of all survey monuments or boundary markers.
|
|
|
Title:
|
| | |
NO CULVERT
|
|
Wording
|
| | |
An approach culvert is not necessary at this location at this time. The access must accommodate a 10-16 foot wide driveway with a 10-25 foot approach radius.
|
|
|
Title:
|
| | |
CRUSHED SURFACING
|
|
Wording
|
| | |
The applicant must place a minimum of 3 inches of crushed rock per WSDOT Standard Spec 9-03.9(3), starting from the edge of the road and extending back a minimum of 20 feet for the full width of the access and its radius. The driveway shall be compacted and graded so the rock material is not carried out onto the roadway and shall begin at the back of ditch, or if there is no ditch, the back of the shoulder. The access and installation of the crushed rock surfacing material shall not impact the existing grade of the county road shoulder.
|
|
|
Title:
|
| | |
RAP ONLY
|
|
Wording
|
| | |
This approval is for a road approach only and does not constitute approval of other activities within the right of way or on this parcel. Any future permits on this site are subject to review for consistency with applicable codes and ordinances and does not preclude review and conditions which may be placed on future permits.
|
|
|
Title:
|
| | |
PRE-CON
|
|
Wording
|
| | |
Applicant must give Jefferson County Public Works office (360-385-9159) a minimum of 7 working days notice prior to beginning work. An on-site pre-construction conference shall be scheduled by the applicant and will include Public Works and the contractor who will be performing the work. Prior to this meeting, any utility locate marks shall be done (Call 811-48 hours before you dig).
|
|
|
Title:
|
| | |
FINAL INSPECTION
|
|
Wording
|
| | |
The Applicant must contact the Public Works Department for a final inspection prior to a final building inspection.
|
|