Description:
|
| | |
Cancel Permit
|
|
Date Completed:
|
| | |
4/16/2019
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Loc Approved for SPAAD "I"
|
|
Date Completed:
|
| | |
10/12/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Print ESA Review Form-F
|
|
Date Completed:
|
| | |
6/16/2009
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
Case Entered
|
|
Date Completed:
|
| | |
6/16/2009
|
|
Disposition:
|
| | |
|
|
|
Description:
|
| | |
App Substantially Complete-U
|
|
Date Completed:
|
| | |
7/31/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Stormwater Review-U
|
|
Date Completed:
|
| | |
8/3/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Env. Sensitive Area Review-U
|
|
Date Completed:
|
| | |
8/3/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Description:
|
| | |
Consistency Review-U
|
|
Date Completed:
|
| | |
9/16/2009
|
|
Disposition:
|
| | |
DONE
|
|
|
Title:
|
| | |
C-SPAAD RAP
|
|
Wording
|
| | |
The road approach is approved for its LOCATION ONLY as approved under ZON09-00075. This approval is valid for a period of 5 years from the date ZON09-00075 was approved. A ROAD APPROACH PERMIT HAS NOT BEEN ISSUED. Proponent shall contact the Public Works Department at 360-385-9160 prior to any land disturbing activity for installation of the road approach to obtain an approved permit. Once the permit is issued it will be valid for one (1) year. The Applicant shall adhere to any conditions as set forth in the approach permit.
|
|
|
Title:
|
| | |
SIGHT BRUSHING
|
|
Wording
|
| | |
The applicant shall be responsible for maintaining all vegetation on their property to maintain the minimum sight distance requirement for this location.
|
|
|
Title:
|
| | |
RESPONSIBLE
|
|
Wording
|
| | |
The applicant shall be responsible for any and all damage to the county roadway and rights-of-way, including the integrity of all survey monuments or boundary markers.
|
|
|
Title:
|
| | |
NO CULVERT
|
|
Wording
|
| | |
An approach culvert is not necessary at this location at this time; however, if drainage becomes a problem here in the future the county reserves the right to require one.
|
|
|
Title:
|
| | |
APPROACH 1
|
|
Wording
|
| | |
The grade of the approach shall be such that all surface water shall not be directed onto the county road. The applicant shall contact the Public Works Department for a final grade inspection prior to completing the driveway.
|
|
|
Title:
|
| | |
CRUSHED SURFACING
|
|
Wording
|
| | |
The applicant must place a minimum of 2 inches of crushed surfacing to the right- of-way line.
|
|
|
Title:
|
| | |
LANDSCAPING
|
|
Wording
|
| | |
Any landscaping disturbed or destroyed as a result of this project shall be restored to its original condition prior to final approval of the project.
|
|