Permit Case Summary

Case Number: Search Help

Case Number:RAP2008-00041 Case Status:Finaled Date Received:4/29/2008
Description:ROAD APPROACH & 911 - SHADOWBROOKE LANE Date Issued:8/13/2008
Applicant:TIMOTHY YALEY Expiration Date:4/4/2010 12:00:00 AM
Site Address:133 SHADOWBROOKE LN Case Finaled:3/22/2010
Parcel No:962700010 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: File Archived
Date Completed: 2/16/2011
Disposition: DONE
Description: Final Inspection Approval
Date Completed: 3/22/2010
Disposition: DONE
Description: Inspection/Conditions Not Met
Date Completed: 10/16/2009
Disposition: DONE
Description: Renew Permit
Date Completed: 6/4/2009
Disposition: DONE
Description: Issue Permit
Date Completed: 8/13/2008
Disposition: DONE
Description: Review Complete-U
Date Completed: 7/17/2008
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 4/29/2008
Disposition:
Description: Case Entered
Date Completed: 4/29/2008
Disposition:
Description: App Substantially Complete-U
Date Completed: 7/15/2008
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 7/15/2008
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 7/15/2008
Disposition: DONE
Description: Consistency Review-U
Date Completed: 8/12/2008
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: STANDARD SPEC
Wording The road work must meet the requirements as stated in the attached Typical Road Section. Specifically, the subgrade must be graded smooth and rolled prior to placing gravel base. The gravel base must be a minimum of 6" compacted depth and 22' in width. The crushed surfacing top course must be a minimum of 2" compacted depth and 22' wide. Basalt material is not acceptable. All material must meet WSDOT specifications. Inspections must be done for each phase of construction i.e., subgrade work, gravel base and top course.

Title: UTILITY INSTALLATION
Wording Any utilities installed within the right of way must be covered under seperate permits held by the utility company which will specify the requirements of installation.

Title: PRE-CON
Wording Applicant must give Jefferson County Public Works office a minimum of 7 working days notice prior to beginning work. An on-site pre-construction conference shall be scheduled by the applicant and will include Public Works and the contractor who will be performing the work.


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: P-PRIVATE ROAD APPROACH
Wording The Applicant may install a private road approach to #133 Shadowbrooke Ln. at mile post .13 left as shown on the site plan submitted with the road approach application. No culvert will be required and a minimum of 2" of crushed surfacing must be installed to the right of way line.

Title: P-CUSTOM PERMISSION
Wording The Applicant may complete the construction of platted Shadowbrooke Ln. from mile post 0.07 (the end of the chip sealed road) to mile post .14 (the end of the subgrade work previously done) based on the conditions as stated below.