Case Number:RAP2003-00193 Case Status:Finaled Date Received:8/6/2003
Description:911 & RAP - Frayne St Date Issued:8/15/2003
Applicant:DAVID ANDERSON Expiration Date:8/15/2004 12:00:00 AM
Site Address:101 FRAYNE ST Case Finaled:11/15/2004
Parcel No:931300001 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: Final Inspection Approval
Date Completed: 11/15/2004
Disposition: DONE
Description: Issue Permit
Date Completed: 8/15/2003
Disposition: DONE
Description: Print ESA Review Form-F
Date Completed: 8/11/2003
Disposition:
Description: Case Entered
Date Completed: 8/11/2003
Disposition:
Description: App Substantially Complete-U
Date Completed: 1/21/2004
Disposition: DONE
Description: Stormwater Review-U
Date Completed: 8/15/2003
Disposition: DONE
Description: Env. Sensitive Area Review-U
Date Completed: 8/15/2003
Disposition: DONE
Description: Consistency Review-U
Date Completed: 8/15/2003
Disposition: DONE

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: CULVERT 12"
Wording A minimum 12 inch diameter culvert of sufficient length to accomodate a 12 foot wide driveway with 25 foot approach radii is required.

Title: CRUSHED SURFACING
Wording The applicant must place a minimum of 2 inches of crushed surfacing to the right- of-way line.

Title: SURFACE WATER
Wording The grade of the approach shall be such that all surface water shall be directed into a ditch line and not onto the county road.

Title: Aquifer Recharge Conditions (SFR)
Wording Critical Aquifer Recharge Areas may require special protection measures to mitigate water quality degradation. The submitted proposal does not require additional aquifer protection measures. However, during construction the project shall follow the Best Management Practices (BMPs) and facility design standards as identified and defined in the Stormwater Management Manual for the Puget Sound Basin (see attached).


Case Findings
Below is a list of findings for this permit case. Findings typically record facts that the staff are using as the basis of their permit processing decisions.
Title: P-PRIVATE ROAD APPROACH
Wording The applicant may install private road approach to Frayne St. at mile post .10 left.