|
Title:
|
| | |
PUSH DAMAGE
|
|
Wording
|
| | |
If any damage to the roadway or shoulder occurs as a result of the installation of the water service, the applicant shall repair the roadway by open cutting the roadway a minimum of 2 feet on each side of the cut and backfilling with (C.D.F.) or a Concrete Density Slurry and compacted in 12 inch lifts. The final lift shall be 3 inches of asphalt concrete pavement. The joints shall be sealed with a petroleum based oil such as C.S.S. #1 or a similar product. The sidewalk shall be restored to its pre-construction condition.
|
|