|
Title:
|
| | |
DEPTH 30"
|
|
Wording
|
| | |
Minimum cover allowed over utility lines placed accross or parallel to the roadway shall be no less than 30" below the level of the ditch or ground level.
|
|
|
Title:
|
| | |
YESCUT
|
|
Wording
|
| | |
The pavement shall be sawcut and the trench shall be backfilled with (C.D.F.) or a Concrete Density Slurry or gravel and compacted in 12 inch lifts. The final lift shall be 3 inches of Asphalt Concrete Pavement which shall include at least 2 feet on each side of the trench. The joints shall be sealed with a petroleum based oil such as C.S.S. #1 or a similar product.
|
|
|
Title:
|
| | |
TRENCHCUT
|
|
Wording
|
| | |
The utility trench shall be backfilled and mechanically compacted.
|
|
|
Title:
|
| | |
WORKER/ROW
|
|
Wording
|
| | |
Any time that workers are on the county right-of-way warning signs shall be posted that workers are present. All workers shall comply with applicable Labor and Industries Guidelines for clothing including reflective vests. Any time that equipment must enter onto the right-of-way, signing and flaggers shall be used in accordance with applicable MUTCD standards.
|
|
|
Title:
|
| | |
NOTINSHOULDER
|
|
Wording
|
| | |
The applicant shall not place any utilities in the roadway shoulder defined as 2'-4' off edge of pavement.
|
|