|
Description:PRE
THIS PROJECT WILL REPLACE TWO CONVEYOR SECTIONS THAT WERE DESTROYED BY FIRE PREVIOUSLY. THE NEW CONVEYORS WILL BE INSTALLED WITH THREE VERTICAL SUPPORTS, AND REQUIRE EVENTUAL REFURBISHMENT OF CONCRETE PILLARS. THE NEW CONVEYORS AND CONCEPTUAL DESIGN WORK IS REPRESENTED ON SKETCH 1000m01REV1 ATTACHED. |
Date Issued: |