|
Title:
|
| | |
A Lot sizes
|
|
Wording
|
| | |
Lot sizes meet minimum area requirements of Chapter 246-272-100 WAC.
|
|
|
Title:
|
| | |
B Review of soils reports
|
|
Wording
|
| | |
Review of soils reports and site inspection by this office indicates that there is sufficient area within each lot with soils suitable for the use of on-site sewage systems.
|
|
|
Title:
|
| | |
H No Certificate of Water Supply
|
|
Wording
|
| | |
A completed Certificate of Water Supply Utility Service has not been supplied to the health department. The project is located in the City of Port Townsend service area and water availability should be documented by means of a completed Certicate.
|
|
|
Title:
|
| | |
CUSTOM RECOMMENDATION
|
|
Wording
|
| | |
Prior to final plat approval, the applicant shall provide written documentation from the City of Port Townsend stating that the city will provide water to the lots.
|
|
|
Title:
|
| | |
A Warning re: on-site systems
|
|
Wording
|
| | |
A Warning to Purchasers regarding on-site sewage system, as provided in JCHD Policy 93-1, shall be placed on the final plat.
|
|
|
Title:
|
| | |
B Location of soil test pits
|
|
Wording
|
| | |
The location of soil test pits shall be graphically portrayed on the final plat.
|
|
|
Title:
|
| | |
G Existing water system
|
|
Wording
|
| | |
Any required improvements or extensions to the existing water supply system shall be completed prior to final plat approval except that performance surety, as provided by Section 5.61, Jefferson County Subdivision Ordinance, may be posted for distribution facilities.
|
|