Permit Case Summary

Case Number: Search Help

Case Number:FPA2601102 Case Status:Finaled Date Received:9/26/1997
Description: Date Issued:
Applicant: POPE RESOURCES Expiration Date:
Site Address: .................... Case Finaled:10/17/1997
Parcel No:502292002 Other Cases Parcel Data Map It

Case Actions
Below is a list of actions that have been taken by staff for this permit case. They are sorted based on the date they were added to the database with most recent actions at the top. A value in the "Date Completed" field indicates that the action has been completed.
Description: (F) Send COMMENT memo
Date Completed: 10/17/1997
Disposition: F
Description: REVIEW COMPLETE: Close Case
Date Completed: 10/17/1997
Disposition: F
Description: Class 3
Date Completed: 10/8/1997
Disposition:

Case Conditions
Below is a list of conditions for this permit case. Conditions typically record requirements that the applicant must meet to be in compliance with the permit.
Title: FINDINGS
Wording The application was reviewed by Jefferson County Permit Center staff on 10-16-97 for the potential presence of critical areas regulaterd under the provisions of the Jefferson County Interim Critical Areas Ordinance, and the following critical areas were confirmed as potentially present on the subject property: landslide hazard, strams (Type 3, McDonald Creek), wetlands (along creek), potential eagle habitat.

Title: Landslide Hazard
Wording Landslide hazard areas exist on the property. The Jefferson County Interim Critical Areas Ordinance requires that a drainage and erosion control plan be submitted and approved. The drainage and erosion control plan shall discuss, evaluate and recommend methods to minimize sedimentation of adjacent properties during and after construction. Surface drainage shall not be directed across the face of a marine bluff, landslide hazard or ravine. Clearing within geologically hazardous areas shall be allowed only from April 1 to November 1, unless the applicant demonstrates that such activities would not result in impacts contrary to the protection requirements contained within the Critical Areas Ordinance.

Title: Landslide Hazard Area Buffers
Wording Buffer areas shall be required to provide sufficient separation between the landslide hazard area and the adjacent proposed project. Buffers shall remain naturally vegetated. Buffers shall be retained in their natural condition. All buffers shall be measured perpendicularly from the top, toe or edge of the landslide hazard area boundary. A standard buffer of thirty (30) feet shall be established from the top, toe and all edges of landslide hazard areas.

Title: Streamside buffers
Wording Buffer areas shall be required to provide sufficient separation between the designated stream and the adjacent proposed project. Buffers shall remain naturally vegetated. Buffers shall be retained in their natural condition. All buffers shall be measured perpendicularly from the ordinary high water mark, or the top of the bank where the ordinary high water mark cannot be identified. Streams with adjacent riparian wetland habitats shall be subject to the buffer widths which apply to their wetland class or the standard streamside buffer widths set forth below, whichever is more restrictive. The following standard streamside buffer width whall be applied to each side of the stream: McDonald Creek (Type 3)- 50 Feet.

Title: Wetlands
Wording Buffer areas shall be required to provide sufficient separation between the designed wetland and the adjacent proposed project. Buffers shall remain naturally vegetated except where the vegetation has been disturbed, invaded by highly undesirable specied, or would substantially benefit from the increased diversity of introduced species. Our review has identified wetlands located along McDonald Creek. The stream buffer of 50 feet should completely contain these wetlands.

Title: Potential Eagle Habitat
Wording Our office was notified of the location of a bald eagle priority habitat area near the above referenced property. The Washington Department of Fish and Wildlife should be notified regarding your proposed project to determine if a Bald Eagle Management Plan will be required.