Title:
|
| | |
FINDING: POTENTIAL CAs
|
|
Wording
|
| | |
The application was reviewed by Jefferson County Permit Center staff on 12/22/00 and 1/03/01 for the potential presence of critical areas regulated under the provisions of the Ordinance, and the following critical areas were confirmed as potentially present on the subject property: seismic hazard, low landslide hazard, class 9 stream, and wetland delineated on the plat.
|
|
|
Title:
|
| | |
FINDING: CONFIRMED CAs
|
|
Wording
|
| | |
Acting upon the above information, Jefferson County staff conducted a site inspection of the subject property on 1/3/01 and confirmed the existence of the following critical areas and/or their associated buffers on the property: delineated wetland and associated buffer.
|
|
|
Title:
|
| | |
CUSTOM FINDING
|
|
Wording
|
| | |
The plat denotes a wetland and associated 50 foot buffer on the north end of the property.
|
|
|
Title:
|
| | |
WETLANDS SETBACK CONDITION
|
|
Wording
|
| | |
A setback of 50 feet, measured perpendicularly from the wetland edge, shall be permanently maintained as a buffer. No filling, grading, clearing or other alteration of the wetland or its buffer is allowed.
|
|
|
Title:
|
| | |
NO WETLAND BUFFER ALTERATION
|
|
Wording
|
| | |
No alteration shall be made to the wetland or its buffer without prior authorization by the Critical Area Administrator. Buffer enhancement is allowed as long as native species are selected for planting.
|
|
|
Title:
|
| | |
MARK WETLAND BUFFER
|
|
Wording
|
| | |
Prior to and during approved construction activities, the perimeter of the wetland buffer shall be marked with a temporary sign. The sign shall be placed in such a manner that it can be directly observed from the construction area. The sign shall contain the following statement: "Wetland and Buffer - Do not Remove or Alter Existing Native Vegetation."
|
|
|
Title:
|
| | |
SEPARATE WETLAND BUFFER
|
|
Wording
|
| | |
The applicant shall permanently separate the upland boundary of the wetland buffer from the remainder of the subject property through installing and maintaining one of the following; logs, trees, a hedge row, or other prominent physical marking. The separation method identified by the applicant shall be approved by the Critical Area Administrator prior to planting or installation.
|
|
|
Title:
|
| | |
CONSTRUCTION ACTIVITIES
|
|
Wording
|
| | |
All construction activities, including the storage and preparation of materials, shall not encroach upon the designated wetland, or its associated buffer.
|
|