Title:
|
| | |
FINDING: POTENTIAL CAs
|
|
Wording
|
| | |
The application was reviewed by Jefferson County Permit Center throught-out July 1997 for the potential presence of critical areas regulated under the provisions of the Ordinance, and the following critical areas were confirmed as potentially present on the subject property: FLOODING
|
|
|
Title:
|
| | |
FINDING: OTHER RELEVANT INFO
|
|
Wording
|
| | |
The Jefferson County Building Inspector gathered data and measurements on site and assessed the elevations. The existing grade elevation, near the structure is 72.2 feet. It was also determined by the Elevation Certificate that the Base Flood Elevation is at 76.0 feet. With the established Base Flood Elevation at 76.0 feet, the proposed structure or any future dwellings, located on this site will have to be 3 feet above the Base Flood Elevation. Thus, the new structure shall have a minimum First Floor Elevation of 79.0 feet when completed.
|
|
|
Title:
|
| | |
FINDING: OTHER RELEVANT INFO
|
|
Wording
|
| | |
The site is also located along a portion of Chimacum Creek. Chimacum Creek is a valuable wetland and as such there are ordiances established to protect the wetland from damage.
|
|
|
Title:
|
| | |
FINDING: OTHER RELEVANT INFO
|
|
Wording
|
| | |
The proposed structure is to be located a 130 feet away from Chimacum Creek. There is also an adjacent proposed structure (shed) that will be placed approximately 114 feet from Chimacum Creek (See Plot Plan). The plot plan indicates that there will no structures/nor future proposals placed within the 75 foot wetland buffer.
|
|
|
Title:
|
| | |
WETLANDS SETBACK CONDITION
|
|
Wording
|
| | |
A setback of 75 feet, measured perpendicularly from the wetland edge, shall be permanently maintained as a buffer. No filling, grading, clearing or other alteration of the wetland or its buffer is allowed.
|
|
|
Title:
|
| | |
NO WETLAND BUFFER ALTERATION
|
|
Wording
|
| | |
No alteration shall be made to the wetland or its buffer without prior authorization by the Critical Area Administrator. Buffer enhancement is allowed as long as native species are selected for planting.
|
|
|
Title:
|
| | |
CONSTRUCTION ACTIVITIES
|
|
Wording
|
| | |
All construction activities, including the storage and preparation of materials, shall not encroach upon the designated wetland, or its associated buffer.
|
|
|
Title:
|
| | |
VEGETATION RETAINED
|
|
Wording
|
| | |
Vegetation retained on-site following completion of clearing for roadways, utilities and the like, may be cleared only if such clearing is absolutely necessary to complete the proposal (Note: This condition shall not be construed as allowing removal of native vegetation within a designated critical area or its associated buffer).
|
|
|
Title:
|
| | |
DEVEL & PLOT PLAN/NOTIFY CONTRATS
|
|
Wording
|
| | |
The proposed development shall be located on the subject property exactly as identified on the Universal Plot Plan, or other Site Plan, approved by the County as part of the triggering permit application. Applicant shall be responsible for contacting and notifying contractor(s) of the above conditions in order to ensure compliance at various stages of construction/development.
|
|
|
Title:
|
| | |
FLOOD CERTIFICATE REQUIRED
|
|
Wording
|
| | |
A flood area certificate is required for all development in the floodplain. The flood certificate shall be completed by a licensed surveyor and shall include a written and graphic portrayal of the following information: a. the location of the subject property in relation to the flood hazard area; b. the distances of the property and the proposed activity from the edge of the waterway; c. the height of the base flood (in relation to mean sea level) within the vicinity of the proposed activity; d. the height of the subject property (in relation to mean sea level).
|
|
|
Title:
|
| | |
RES CONSTRUCTION FLOOD DAMAGE
|
|
Wording
|
| | |
All new construction shall use construction methods which minimize flood damage.
|
|
|
Title:
|
| | |
CUSTOM CONDITION
|
|
Wording
|
| | |
The applicants First Floor Elevations (FFE) for all proposed structures shall be at a minimum of 79.0 Feet. This is 3 feet above the established Base Flood Elevation of 76.0 feet.
|
|